Model: | all series |
---|---|
Brand: | Sino Cable Gland Factory |
Origin: | Made In China |
Category: | Chemicals / Plastic Materials |
Label: | Kabelwartels , Wurgwartels , Wartel polyamide |
Price: |
US $0.062
/ pc
|
Min. Order: | 2000 pc |
Last Online:16 Mar, 2023 |
(1) Raw Material:
◆ Nut, Locknut & Body: 100% new PA 66,94V-2 approved by UL.
◆ Hermetic Seal & Washer: NBR, EPDM or natural rubber.
(2) Standard Colors:
Light-grey RAL7035, black RAL9005 (other colors can be customized: blue, green, yellow, red, dark-grey, milk,etc).
(3) Claw:
The claws & seals of excellent design can hold cables firmly and have wider cable ranges.
(4) Protection Degree:
It can reach IP68 (used with Washer within its cable range).
(5) Operation Temperature:
Ambient temperature: Quiescent state:-40 degrees to 100 degrees, short time to: 120degrees. Dynamic:-20 degrees to 80 degrees, short time to:100 degrees.
(6) Certificates:
CE, ROHS, PAHS, REACH, SGS, IP68.
(7) Features:
Waterproof, acid & oil resistant, UV resistant, anti-aging, durable, good performance, long-life.
(8) How to install:
With special design and good tensile strength, cables can be directly inserted into the hole of the same size thread and then fix it with the Locknut.
(9) Applications:
Used for fixing cables and provide the effecitve protection against dust, water, oil penetrating the electrical distribution box, electromechanical control panel and other instruments. Innovative design for the Seal and Clamp, wide clamping range, strong resistence against the tensile strength and thus it can protect cables effectively.
(10) Specifications available:
◆ PG7, PG9, PG11, PG13.5, PG16, PG21, PG29, PG36, PG42, PG48, PG63.
◆ M12x1.5, M14x1.5, M16x1.5, M20x1.5, M22x1.5, M25x1.5, M27x1.5, M32x1.5, M40x1.5, M50x1.5, M63x1.5.
◆ NPT3/8", NPT1/2", NPT3/4", NPT1", NPT1-1/4", NPT1-1/2".
◆ BSC3/8", BSC1/2", BSC3/4", BSC1", BSC1-1/4", BSC1-1/2", BSC2".
◆ G1 / 4", G3 / 8", G1 / 2", G3 / 4", G1", G1-1 / 4", G1-1 / 2", G2".
Price Terms: | FOB, CNF,CIF |
---|---|
Payment Terms: | T/T |
Packing: | polybag packing / color inner box packing |
Lead Time: | 8-10 days |
Standards Certificate: | CE,ROHS,SVHC,REACH,SGS,IP68 |