Model: | SC200/200 |
---|---|
Brand: | Betop |
Origin: | Made In China |
Category: | Industrial Supplies / Construction Machine |
Label: | Material hoist , lifter , construction site |
Price: |
US $40000
/ pc
|
Min. Order: | 1 pc |
Last Online:09 Jun, 2014 |
Protective Measures of construction hoist:
1. A Master switch on the operation board: When the button turned off, unexpected action to other buttons can not let cage working.
2. Anti-falling safety device (with Centrifugal breaking system ): When all other protection device losing action, it can protect the cage from falling.
3. Mechanical inter-locking door: when the cage running it can close by itself from protecting people from dropping.
4. Overload alarm device.
5. Upper and lower travel limit: They can limit the cage go over the top mast.
6. The top mast section have no rack in order to protect the cage from overrunning or dropping.
7. Manual button: You can operate the botton to let the cage go down when interruption of power supply.
8. Emergency switch: When the cage losing control or over-runing,you can press in this button.
Main technical parameters:
1.Construction hoist of common models:
Characteristic |
Model |
Rated Loading |
Lifting Speed |
Motor Power |
Double cabin |
SC200/200 |
2×2000kg |
33m/min |
2×(3×11kw) |
SC150/150 |
2×1500kg |
33m/min |
2×(2×15kw) |
|
SC100/100 |
2×1000kg |
33m/min |
2×(2×11kw) |
|
Single cabin |
SC200 |
2000kg |
33m/min |
3×11kw |
SC150 |
1500kg |
33m/min |
2×15kw |
|
SC100 |
1000kg |
33m/min |
2×11kw |
2. Construction hoist with Interver :
Characteristics |
Model |
Rated Loading |
Lifting Speed |
Motor Power |
|
Double Cabin
|
Low-speed |
SC200/200D |
2×2000kg |
0-33m/min |
2×(3×11kw) |
SC100/100D |
2×1000kg |
0-33m/min |
2×(2×11kw) |
||
Mid-speed |
SC200/200Z |
2×2000kg |
0-60m/min |
2×(3×11kw) |
|
SC100/100Z |
2×1000kg |
0-60m/min |
2×(2×11kw) |
||
Single Cabin |
Low-speed |
SC200D |
2000kg |
0-33m/min |
3×11kw |
SC100D |
1000kg |
0-33m/min |
2×11kw |
||
Mid-speed |
SC200Z |
2000kg |
0-60m/min |
2×11kw |
|
SC100Z |
1000kg |
0-60m/min |
3×11kw |
Product details:
1. Production process: Strict material selection— blanking— inspection — welding— inspection— Blasting — inspection —Baking finished or galvanized— inspection — Finished Product
2. The product can be customized according to customers'requirements (drawing, specifications and so on).
A: The Mast section(color is variable) is made of seamless pipe.(The Mast section is made of seamless pipe)
B: Main structure of cage is made of high-quality steel after bending.(The bended steel is firm, good verticality, stability. Moreover it ensure stable of the whole structure)
C: The cage is boarded up by all punched aluminum sheet.(It is anti-aging , ante-rust, light-weight and beautiful in its service life)
D:Access door interlock device protects the saftey of people and materials
E:Equiping with fall arrestor device
F:Equiping with interver in variable frequency construction hoist
Workshop Details and Transport Details:
1. All Production Line adopt standard of the fixture, mould, gauge
2. Workshop 5S mangement style
3. Each Construction Elevator should be testing-run and adjustment in Factory
4.Different driven system
5.Outdoor construction Site
6.Transport to Qingdao(China) port
7.Exhibition in Qingdao(China) port
8.International certification