Model: | 10025 |
---|---|
Brand: | qijia |
Origin: | Made In China |
Category: | Industrial Supplies / Industrial Supplies Stocks |
Label: | corrugated steel pip , corrugated culvert , corrugated steel tub |
Price: |
US $100
/ pc
|
Min. Order: | 100 pc |
Last Online:07 Jan, 2015 |
corrugated steel pipe introduction
1. *With a multitude of pipe sizes, shapes, gages, coatings and materials options, corrugated metal pipe (CMP) products offer specifiers and users the greatest versatility and flexibility in designing drainage solutions to best fit their projects’ exact requirements. Our CMP products provide the highest service life, strength and hydraulic properties.
2.*Corrugated steel pipe has distinct advantages over other matirials because of it light weight,strength,easy to installation,low maintenance and adaptability to various field conditions.
3.Stell pipe is manufactured from pre-coated steel coil, corrugated and formed into pipe.The coating is made of by Hot dip zinc technology.Steel thickness and corrugation profile depend on the type of structure,height of cover and live load over the stucture.And also, our corrugated steel pipe can be producted according to customers' design and requests.
Corrugated Steel Pipe Specification
Product Name |
Corrugated Steel Pipe |
|
Specification |
Inner Diameter |
450~12000MM |
Outside Diameter |
ID+WT+D |
|
Wall Thickness |
2~12MM |
|
Spacing Wave |
68~300MM |
|
Height of Wave |
55MM |
|
Length |
300~1800MM or according to the customer's request |
|
Syestem Interface |
Overlap connection |
|
Technique |
Hot dip zinc |
|
Product Features |
Light weight-can be nested for economical shipping |
|
High strength and durable |
||
Environmentally |
||
Long service life-capable of 100+years |
||
Fast installation-economical,versatility,and flexibility |
||
Application |
1. structral relines,road culverts. 2.storm sewers 3.stormwater detention systems 4. oil or gas transportation 5. fluid pipe 6. line pipe 7. drill pipe 8. boiler pipe 9. other uses we can produce according to customer requirement |
|
Package |
plastic caps on both ends,steel bundle or according to the customer's |
|
Payment Term |
By T/T , LC, os our negotiated payment term |
|
Delivery time |
7~15days after receiving the deposit, depends on the order quantity |
corrugated steel pipe Plate of schematic diagram
If you intrested in our products, please contact me,I will give you the best quality product and the cheapest price!
Thank you
Sincerely
Young Lee
Payment Terms: | T/T |
---|---|