Model: | HDPD |
---|---|
Brand: | Huadong |
Origin: | Made In China |
Category: | Sports & Recreation / Sport Products / Athletic |
Label: | rubber running track , rubber floor track , rubber floor |
Price: |
US $31.6
/ sqm
|
Min. Order: | 100 sqm |
Last Online:27 Jul, 2015 |
IAAF product certified, IAAF class 1 athletics facility certified, ISO 9001 and ISO 14001
We are the supplier of 2014 Incheon Asian games rubber track
2014 winter Olympic games ceremony rubber mat
EPDM synthetic rubber vulcanization of the further strengthen of the materials of polymer, the good performance for Aging resistance, weather resistance, electrical insulation, corrosion resistance, impact resistance etc.
Natural rubber has excellent properties of high elastic insulation, waterproof, low specific gravity, after appropriate treatment with alkali, heat, cold, pressure. Full solid be consistent from beginning to end, and has maximum compression deformation. Its advanced partition design maximizes absorption and recovery of energy.
HDPD-A
Professional type: for athletic field of Olympic, continental championship, professional training
HDPD-B
Standard type: for athletic field of high school, university, physical college, sports center, stadium
HDPD-C
Conventional type: for athletic field of primary school, high school, college, university, gymnasium
HDDD
Indoor, outdoor table tennis, basketball, badminton and other kinds of course
HDPD-F
Auxiliary Road venue ground
Properties |
References |
Standard data |
Inspection result |
Tensile strength |
IAAF |
≥0.5Mpa |
≥0.8Mpa |
Elongation at break |
IAAF |
≥40% |
≥180% |
Hardness shore A |
GB/T14833-2011 |
45-60° |
52° |
Fire Rating |
GB/T14833-2011 |
1° |
1° |
Force reduction |
IAAF |
35-50% |
45% |
Skid resistance value |
IAAF |
≥47BPN20℃ |
≥49BPN20℃ |
Vertical deformation |
IAAF |
0.6-1.8mm |
1.2mm |
Thickness | 13 mm |
Width | 1.22m |
Length | 15 m/roll |
> > > Customized Colors are accepted |
Feature:
No Coating and No Granules, UV Stable
Extremely Maintenance Friendly, Normal rainfalls carry away the surface dirt
Provides Great Traction In Wet Conditons
Two Components Polyurethane Adhesive is needed to pasting the track surface to the foundation
Relationship Material Needed and Supplied:
1. Painting for lines Marking.
2. PU adhesive for installation
3. Aluminium Curbing for a perfect running track system
4. Shot put circle and shot put toe board pre-installed while doing installation of running track surface
5. Take off board pre-installed while doing installation of running track surface
Company Information
Packaging & Shipping
Payment Terms: | T/T |
---|---|