Lamp Start, Run-up time and Flicker Test
Product Description
Dated 14th December, 2012, the EU officially released the (EU) NO 1194/2012rules <Implementing rules of the European Parliament and the EU Council Directive 2009/125/EC on the eco-design requirements of directional lights, LED lights and related equipment requirements>.Compared with <European Parliament and Council Directive 2005/32/EC implementing rules for non-directional household lamps eco-design requirements> which posted by theEuropean Commission Regulation (EC) NO 244/2009 Regulations dated 18th March, 2009, the new rules have complete mandatory and eco-design requirements. Start and Run-up time as the two indicators functional requirements in the industry has been more emphasis by manufacturers.
To meet EU ErP requirements, IEC60969 Self-ballasted Lamps for General Lighting Services Performance requirements and Energy Star about Lamp Start, Run-up Time and Flicker Test. LISUN developed ErP test system, the LSRF-1 system hardware include following LISUN insruments: PH3000, IS-1.5MA, SLS-50W and LSP-500VAC; the software include the Lamp Start, Run-up Time and Lamp Flick Test.
Send Inquiry to this Member
Related Products of this Company
This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please
click here.
China Suppliers Quick Searching:
,