Model: | MH |
---|---|
Brand: | Dongqi |
Origin: | Made In China |
Category: | Industrial Supplies / Other Industrial Supplies |
Label: | gantry crane , hoist gantry crane , single girder gantry |
Price: |
US $1000
/ pc
|
Min. Order: | 1 pc |
Last Online:19 Nov, 2015 |
10t hoist gantry crane
1 gear box gantry crane Brief introduction:
a. MH model single beam gantry crane with electric hoist is matched with CD1/MD1 model wire rope electric hoist. single beam gantry crane with hook
b. Traveling gantry crane is consisted with gantry frame(main girder, legs, bottom end beams), lifting mechanism, travelling mechanism, and electrical control.
c. 5t gantry crane is widely used in workshop, storage, port and hydroelectric power station and some other outdoor place, where it has a low frequency or few lifting times.
It is forbiden to be used with melt metal, inflammable, or explosive objects.
2 gear box gantry crane Features:
a. Simple structure, installation, use, and maintenance are all convenient.
b. Parts standardization, the generalization and seriation
c. Good in usability and produce conveniently
3 gear box gantry crane Protection Devices:
a. Preventing hook clashing the top.
b. Circuit self-test protection device.
c. Protecting the current lacking of any phase.
d. Outdoor cranes are equipped with hoisting mechanism, electrical control box and rainproof devices.
e. Anti-collision, sound and light alarm devices.
f. Equipped with rail clamp.
4 gear box gantry crane Mechanical Part:
a. Main girder is used of U template and range of welding surface into the composite beams
b. Use the high quality carbon steel of Q235B or Q345B
c. The main girder and end beams are connected with the high strength bolt of 10.9 grade.
d. The Crane travelling mechanism uses trinity drive.
5 gear box gantry crane Controlling Ways:
a. Generally, ground controlling
b. Cab controlling is also available according to customer's requirement
c. Operating cab: open style and close style, left or right installation
d. Direction of entrance: side, end and top.
6 gear box gantry crane Parameters:
MH Electric Hoist (box-type) Gantry Crane 5t | |||||||||
Span | S(m) | 12 | 16 | 20 | 24 | 30 | |||
Lifting height | m | 9 | 9 | 9 | 9 | 9 | |||
Lifting speed | m/min | 7 | 7 | 7 | 7 | 7 | |||
Trolley speed | m/min | 20 | 20 | 20 | 20 | 20 | |||
Crane speed | m/min | 20 | 20 | 20 | 20 | 20 | |||
Lifting motor | kw | 13 | 13 | 13 | 13 | 13 | |||
Trolley motor | kw | 0.8 | 0.8 | 0.8 | 0.8 | 0.8 | |||
Total weight | kg | 16100 | 18700 | 21600 | 26600 | 30100 | |||
Max Wheel Load | KN | 102 | 110 | 118 | 126 | 149 | |||
Track | P38 | P38 | P43 | P43 | P43 | ||||
Main dimension | mm | 12 | 16 | 20 | 24 | 30 | |||
Rail top to main top | H | 11350 | 11450 | 11550 | 11650 | 12250 | |||
Wheel base | W | 6500 | 6500 | 7500 | 7500 | 7500 | |||
Crane width | B | 7100 | 7100 | 8100 | 8100 | 8100 | |||
Hook left limitation | S1 | 1300 | 1300 | 1300 | 1300 | 1300 | |||
Hook right limitation | S2 | 1900 | 1900 | 1900 | 1900 | 1900 | |||
Left cantilever | L1 | 3000 | 4000 | 5000 | 6000 | 7500 | |||
Right cantilever | L2 | 3000 | 4000 | 5000 | 6000 | 7500 | |||
Note: Control mode for ground operation |
MH Electric Hoist (box-type) Gantry Crane 16t | |||||||||
Span | S(m) | 12 | 16 | 20 | 24 | 30 | |||
Lifting height | m | 9 | 9 | 9 | 9 | 9 | |||
Lifting speed | m/min | 3.5 | 3.5 | 3.5 | 3.5 | 3.5 | |||
Trolley speed | m/min | 18 | 18 | 18 | 18 | 18 | |||
Crane speed | m/min | 20 | 20 | 20 | 20 | 20 | |||
Lifting motor | kw | 13 | 13 | 13 | 13 | 13 | |||
Trolley motor | kw | 0.8 | 0.8 | 0.8 | 0.8 | 0.8 | |||
Total weight | kg | 18200 | 20700 | 25500 | 28100 | 32000 | |||
Max Wheel Load | KN | 150 | 159 | 164 | 176 | 190 | |||
Track | P38 | P38 | P43 | P43 | P43 | ||||
Main dimension | mm | 12 | 16 | 20 | 24 | 30 | |||
Rail top to main top | H | 12500 | 12600 | 12700 | 12800 | 13400 | |||
Wheel base | W | 7000 | 7000 | 8500 | 8500 | 8500 | |||
Crane width | B | 7500 | 7500 | 9200 | 9200 | 9200 | |||
Hook left limitation | S1 | 1300 | 1300 | 1300 | 1300 | 1300 | |||
Hook right limitation | S2 | 1900 | 1900 | 1900 | 1900 | 1900 | |||
Left cantilever | L1 | 3000 | 4000 | 5000 | 6000 | 6000 | |||
Right cantilever | L2 | 3000 | 4000 | 5000 | 6000 | 6000 | |||
Note: Control mode for ground operation |
Part 2 gantry crane Production standard:
Part 3 gantry crane Manufacturer process:
gear box gantry crane
NOTICE: The sell is equal to both of us and we are sell not only the product, but also the service.
Please contact me if you have any problems.
Keeping innovation and pursuing excellence’ are our critical concept. Warmly welcome every friend to our company.
Payment Terms: | TT and LC |
---|---|