Model: | - |
---|---|
Brand: | - |
Origin: | - |
Category: | Industrial Supplies / Machinery / Pumps Vacuum Equipment |
Label: | hydraulic pump |
Price: |
¥1
/ pc
|
Min. Order: | 1 pc |
Last Online:09 Dec, 2015 |
hydraulic pump manufacturers_hydraulic pump parts_hydraulic pumps and motors suppliers in china
China hydraulic pump manufacturers, hydraulic pumps and motors, hydraulic pump parts, piston pump parts, hydraulic pump, hydraulic spare parts, hydraulic piston pump, hydraulic vane pump, hydraulic gear pump, Hydraulic Motor,Pilot Pump, Charge Pump for Rexroth,Caterpillar,Vickers,Denison,Sauer,Kawasaki,Commercial,Linde,Parker,Liebherr,Komatsu,Eaton,Daikin,Kubota,Johndeer,Hitachi. T6C,T6D,T6E,45VQ,35VQ,25VQ,20VQ,V10,V20,Hydraulic Motor.
Our website: www.pepfluid.com
15, welding process selection: acetylene gas welding of carbon steel is mainly used for general 2mm wall thickness of less than or equal tube. Arc welding is mainly used for carbon steel pipe wall thickness greater than 2mm tube. TIG welded pipe is best to use. Pipe wall thickness greater than 5mm backing should adopt welding, arc welding filled. Necessary occasions should be used to protect gas pipe hole filling method of welding.
16, the electrode, the welding flux should match the pipe, the grade must have a clear basis of information, product certification, and the effective use period. Welding, flux before using the instructions provided its products should be dried and kept dry during use, for use in the same day. Electrode Coating should be no loss and significant cracks.
17, a pump station pipe welding should butt welding. Before welding groove and its vicinity should be 10 ~ 20mm wide at the surface dirt, traces of oil, water and rust, etc. cleaned.
18, welded pipe and flange should butt welding flange, non-use plug-in flange.
19, welded pipe and butt-welded joints should be used, not be used in the form of plug-in.
20, welded pipes and pipe should butt welding, soldering not allowed to use the plug-in form.
21, when the hydraulic pipes butt welding, weld must be higher than the inner wall of the pipe 0.3 ~ 0.5mm. Recessed wall phenomenon is not allowed. After the solder, and then filing or hand wheel the inner wall above the weld repair level. Removing welding slag, burrs, to achieve a smooth level.
22, butt weld pipe cross-section should be perpendicular to the centerline.
23, the weld cross section is not allowed in the corner, it should also be avoided between two elbow pipe.
24, welding pipe, you must press the installation location spot welding position, then remove to welding, the welding assembly after shaping.
25, welding the whole process, should prevent wind, rain, snow invasion. After the pipe welding, the wall thickness of less than or equal to 5mm weld, should be cooled at room temperature, not use strong wind or water spray forced cooling.
26, the weld penetration should be, should be uniform smooth appearance. Weld pressure pipeline testing and inspection should be sampled.
27, conduit pipe welding after all pipes are pre-installed location should once. Each hydraulic components, valve block, valve frame, pumping stations connected. Each interface should be a natural fit and, for the connection is not strong twist. When you release the fittings or flange screws, the relative binding surface centerline not allowed to have a larger displacement, from the angle of the seam or Rocker. In such event available roasted shaping eliminated.
28, can be completed after all the pipe weld pipe clamps and racks can also be carried out according to the needs of post *.
29, conduit piping, welding, after the pre-installation, re-open the pickling phosphating. After the acid phosphate by pipeline to pass into the hot air pipe for quick drying. After drying, as in a few days to re-loaded into the system, which leads to the inner tube of hydraulic oil, usually do not make anti-rust treatment, but should be kept properly. As to be shelved indefinitely, you need anti-rust coating paint, it must handle the 48 hours before painting after phosphating. It should be noted, anti-rust coating must be compatible with the cleaning solution or pipe cleaning after use of hydraulic oil.
30, before the pipeline in acid, phosphate, install it again after drying, the need for each of the pipe wall to conduct a pre-cleaning. After the pre-cleaning is completed as soon as possible to re-install the system, the system's overall circulation purification, until the required cleanliness level system design.