Model: | GT-LAL |
---|---|
Brand: | GAOTENG |
Origin: | Made In China |
Category: | Metallurgy , Mining & Energy / Metallurgy & Mining / Non-metallic Mineral Products |
Label: | used fire brick , landscaping bricks f , high aluminum fire b |
Price: |
US $9970
/ ton
|
Min. Order: | 1 ton |
Last Online:08 Aug, 2023 |
Item | hot industrial aluminum lining brick used for milling grinding | ||||||||||||||||||||||||||||||||||||||||||
HS code | 69091200.00 | ||||||||||||||||||||||||||||||||||||||||||
Application |
Alumina lining bricks are the perfect solution for protecting ball mills from wear when the equipment grinding the clumpy raw materials to the fine powder. |
||||||||||||||||||||||||||||||||||||||||||
Size |
|
||||||||||||||||||||||||||||||||||||||||||
MOQ |
1 ton |
||||||||||||||||||||||||||||||||||||||||||
Sample | available | ||||||||||||||||||||||||||||||||||||||||||
PRODUCT CHEMICAL COMPOSITION AND PHYSICAL PROPERTIES |
|||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||
DELIVERY DETAILS |
|||||||||||||||||||||||||||||||||||||||||||
Package |
|
||||||||||||||||||||||||||||||||||||||||||
Delivery time |
|
||||||||||||||||||||||||||||||||||||||||||
Price term |
EXW, FAC, FOB, CFR recommend, CIFrecommend |
||||||||||||||||||||||||||||||||||||||||||
Payment term | L/C at sight, 30% TT in advance, DP, DA | ||||||||||||||||||||||||||||||||||||||||||
Documents |
|
Package:
Installation drawing:
Installation Instruction:
1.Before installing, remove all the remaining pieces of the previously installed bricks and cement from the internal surface of ball mill. Roughen smooth surface and fix damaged iron shell with electric welding tool.
2.The installation gap should be within 1mm, using 425# white cement and 107# glue as combining glue.
3.Installation begins from side walls. Side wall will be installed with rectangle bricks and half rectangle bricks. Then come to the cylinder installation. Use rectangle bricks and ladder type bricks in pairs. One rectangle brick following with one ladder type brick to ensure the bricks stick to the inner wall of ball mill closely(Sometimes,the installation should be based on the actual situation). Until the last bit, if the regular size of bricks can not be fit in, use thin blocks. After finishing installation, clean up the surface.
4.To ensure the cement perform the maximum cohesion and intensity, spry water on the surface in the first two days. Then fill up the ball mill with water for 10 days.
Related Products:
Founded | 2000 years |
Certificate | ISO9001:2008, WIFFA |
Main export area |
Europe,Southeast Asia,Japan,Korea, Middle East,North Africa and etc. (Japan,Malaysia,Indonesia,Vietnam,India,Saudi Arabia,Egypt,Bangladesh,Lebanon,Italy,UK,Russia, Chile, and Dominican etc. ) |
Location | No.78 Luxun Rd., Zhongshan Dist., Dalian, China |
Logistics service | member of WIFFA |
Clients:
Ceramic fair:
Certificate:
Gaoteng team:
high alumina lining bricks alumina lining bricks for mills
Al2O3>92%,Hardness>9
Volume density:3.65g/cm3
Thickness:40mm,50mm,70mm
Payment Terms: | TT / LC / DP / DA |
---|---|