Home > Products > Metallurgy , Mining & Energy > Energy > Bitumen

Go Green cold mix colored asphalt 1Go Green cold mix colored asphalt 2Go Green cold mix colored asphalt 3Go Green cold mix colored asphalt 4
  • Go Green cold mix colored asphalt 1
  • Go Green cold mix colored asphalt 2
  • Go Green cold mix colored asphalt 3
  • Go Green cold mix colored asphalt 4

Go Green cold mix colored asphalt

Model:-
Brand:Go Green
Origin:Made In China
Category:Metallurgy , Mining & Energy / Energy / Bitumen
Label:cold mix colored asp , landscape road , colored road
Price: -
Min. Order:-
Inquire Now

Member Information

Detail

Product Description

Go Green Cold Mix Colored asphalt is a new patented high technology product, uses eco-friendly cold mix processing and significant ultra thin overlay technology, the material can be storaged and shelf life unopen up to six months. Its suitable for landscaping paving, sport and leisure, public parks and gardens, bus lane, bicycle path as well as light traffic driveway paving. The paving thickness is only 1.0-1.5cm, which greatly reduce the material cost. 

   

Different color available

Outstanding Features

Go Green Micro-Paving Cold Mix Color Asphalt has some basic performances such as soft, easy to compact, water stability, long shelf time, excellent strength, construction at normal temperature, they are generally described as follows:

A. Cold mix technology. Paving thickness only 1.0-1.5cm.

B. Noise reduction, Anti-slip and Fog-proof.

C. Stick to the original pavement surface closely

D. Storage up to 6 month

E. Excellent resistance to water damage.

F. Environmental Protection

G. Construction time no limitation.

Different color available, lively colors protection 

Application Area

Package are available in 20kg bag and 1 ton bag

How to Use

Step one:

Preparation

1.   The product construction temperate should be above 0°C, recommend to construct above 5 °C

2.   Clean the Debris of the road. The surface should be free of ice, standing water, snow, and loose material.

Step two:

Paving 1.0-1.5cm thickness by standard asphalt paver.

Step Three:

Compact the surface as soon as possible, after  1-2 hours, compact 4-5 times to guarantee the compaction without crashing aggregate.

Step Four:  

Close traffic completely after construction. till pavement surface is dry and hard, depends on the weather, usually open to traffic after 6-12 hours. 


Product Image

Go Green cold mix colored asphalt 1
Img 1
Go Green cold mix colored asphalt 2
Img 2
Go Green cold mix colored asphalt 3
Img 3
Go Green cold mix colored asphalt 4
Img 4

Send Inquiry to this Member

Go Green Industrial (Shanghai)Co.,Ltd

808, YongYe Mansion, No.2240 South Pudong Road. Pudong District, Shanghai China

Phone:
86-21-61053027
Fax:
86
Contact:
Paris Lau (Export Manager)
Mobile:
15900640746

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Bitumen Made In China Products

,  

Bitumen China Suppliers and China Manufacturers