220kv Substation framework
Product Description
220kv Substation framework
Packaging & Shipping
Our poles as normal cover by Mat or straw bale at the top and bottom ,anyway also can following by client required , each 40HC or OT can loading how many pcs will calculation base on the client actually specification and data.
FAQ
1. Payment: (1)Telegraphic Transfer(30% advance payment, balance before shipment
(2)Telegraphic Transfer(30% advance payment, balance against copy of documents
(3)Letter of Credit: at sight
2. Lead Time: 2 weeks after confirmed order
3. Delivery way: by sea
Product Description
Available height:5-80m
Electric pressure:10kv--550kv
Material:Q345B/A572,minimum yield strength>=345MPA,
Q235B/A36,minimum yield strength>=235MPA
Galvanized:Hot dip galvanization,thickness is>=12um
Delivery lead time:30 days after receiving 30% deposit
Lifetime:Minimum 25 years
Structure:Overlap connection/Flange connection
Galvanizing standard:EN ISO 146,ASTM/A123
Manufacturing and workmanship:BS449 or AISC
Welding standard:BSEN287,BSEN288 or equivalent
Production process and Finished products
Tension test and load test
http://www.chinasteelpole.com
Product Image
Img 1
Img 2
Img 3
Img 4
Img 5
Send Inquiry to this Member
This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please
click here.
China Suppliers Quick Searching:
,