Home > Products > Electronics & Electricity > Power Transmission Equipment & Transformer

200KW AC Resistive Load Bank 3 Phase Ac Load Bank 1200KW AC Resistive Load Bank 3 Phase Ac Load Bank 2200KW AC Resistive Load Bank 3 Phase Ac Load Bank 3
  • 200KW AC Resistive Load Bank 3 Phase Ac Load Bank 1
  • 200KW AC Resistive Load Bank 3 Phase Ac Load Bank 2
  • 200KW AC Resistive Load Bank 3 Phase Ac Load Bank 3

200KW AC Resistive Load Bank 3 Phase Ac Load Bank

Model:ACO-380/20
Brand:J-ENERGIZE
Origin:Made In China
Category:Electronics & Electricity / Power Transmission Equipment & Transformer
Label: -
Price: US $3999 / pc
Min. Order:1 pc
Inquire Now

Member Information

Detail

Product Description

If your company offers generator test services, this load bank can help you finish all loading test simply. It is rated 200kw at 220v/380v, 3-phase 200kw at 380v, 1-phase 66kw at 220v.

 

It allows you to enter an actual load value, up its max rating, and the load bank automatically goes to that setting. it will measure the applied voltage and will calibrate the loads to that voltage. Within the capacity of the load bank, the load requested is the load applied. It’s that simple!

 

Functions & Features

◆ It has harmonic analysis of 2-50 orders of harmonic content and the total harmonic content for voltage or current.

◆ Large LCD screen, keyboard operation design.

◆ Parallel operation function to enlarge the capacity.

◆ 30 groups of test data can be saved, for checking and exporting.

◆ Powerful PC software can detect data real time operation, upload and analyze data and pattern and print report etc.

◆ Full protection function, it can turn off load, terminate discharging and alarm automatically when over temperature and over current.

◆ Set at most 5 groups power, memory active load process automatically.

 

Why need a load testing?

A load testing is part of the maintenance for a generator.

There are multiple reasons generator should undergo a load bank test on an annual basis, including but not limited to the following:

  •  Verifies the generator capabilities opposed to just routinely starting it up.
  •  Problems discovered early can be significantly less expensive and prevents future major issues.
  •  Helps to avoid wet-stacking and cleans out carbon deposits.
  •  Verifies the engine cooling systems will perform while under load.
  •  Provides assurance that the generator should work properly when you need it most.

What it will be tested?

  •  Three-phase voltage
  •  Current
  •  Active power& reactive power
  •  Apparent power
  •  Power factor
  •  Frequency
  •  Running time
  •  Energies of generators and UPS

Payment Terms:TT/LC

Product Image

200KW AC Resistive Load Bank 3 Phase Ac Load Bank 1
Img 1
200KW AC Resistive Load Bank 3 Phase Ac Load Bank 2
Img 2
200KW AC Resistive Load Bank 3 Phase Ac Load Bank 3
Img 3

Send Inquiry to this Member

XIAN JUNBIAO ELECTRONICS TECHNOLOGY CO LTD

Add:Floor 9-10 of Block A, National Digital Publishing Base

Phone:
86-29-65659372
Fax:
中国
Contact:
Arms (manager)
Mobile:
13096930906
This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Power Transmission Equipment & Transformer Made In China Products

,  

Power Transmission Equipment & Transformer China Suppliers and China Manufacturers