Model: | - |
---|---|
Brand: | Zanhong |
Origin: | Made In China |
Category: | Industrial Supplies / Rubber & Plastics Machine |
Label: | - |
Price: |
-
|
Min. Order: | 1 pc |
Last Online:10 Jan, 2021 |
The Fast Grinding Unit coal water slurry fast grinding unit coal pulverizer machine manufacturer
Product Description
The Fast Grinding Unit is a special equipment for coal water slurry independently developed by our company. This equipment can be used directly to replace the bulky and energy-consuming large-scale ball mill for flotation clean coal slurry preparation. This equipment can change the particle size gradation of coal slurry to improve stability and reduce The viscosity of coal slurry improves the flow performance of coal water slurry, and when used with ordinary ball mills, it can significantly increase hourly output and save production costs.The top is the Coal slurry inlet and the bottom is the Coal slurry outlet.
We can design that how many Grinding units according to customers requirement. More Grinding units, more yield.
There are Grinding balls inside, which can grinding the Coal slurry very finely.
The Grinding balls are very wear-resistant.
Zanhong coal vertical roller mill Features
Change the particle size gradation of coal water slurry, improve the stability of coal water slurry, reduce the viscosity of water slurry, and improve the flow performance of coal water slurry. Can be used with ordinary ball mills to increase hourly output and save costs.
Parameter
Power: 15KW-22KW
Number of disc layers: 3-6 layers
Process flow
1. Raw coal from the yard are conveyed through screen to belt conveyors. The raw coals after iron removal by electromagnetic separator are put into the warehouse for storage.
2. After grinding system has started, please turn on the rod valve in the bottom of raw coal storage, and start sealing measuring belt to coal mill, then raw coal will be dryed and ground in the vertical coal mill.0608454165.jpg
3. The mixture of hot air or waste gas of cement production line are sucked into Vertical Coal Mill, under blower’s function. After complete heat exchange with ground coal, the coal powder are brought to separator for separation. The unqualified coarse coal powder falls to the grinding table for regrinding. The qualified coal powder will be collected with the airflow into the anti-explosion impulsive dust collector, through the grid wheel are discharged into pulverized coal storage.
4. The debris of raw coal, such as coal gangue, metal block, etc. will be discharged through the wind ring, discharge hole.
Hebei Zanhong provide plastic bottle washing tank, ABS plastic crusher, PET bottle production line, etc. Sheet metal cone rolling machine and coal grinding equipment are our main products.
Our website:www.chinazhmachine.com