Home > Products > Construction & Decoration > Pipe, Tube & Parts > Other Pipes & Tubes

EN39-EN10219 Scaffolding 1EN39-EN10219 Scaffolding 2EN39-EN10219 Scaffolding 3EN39-EN10219 Scaffolding 4EN39-EN10219 Scaffolding 5
  • EN39-EN10219 Scaffolding 1
  • EN39-EN10219 Scaffolding 2
  • EN39-EN10219 Scaffolding 3
  • EN39-EN10219 Scaffolding 4
  • EN39-EN10219 Scaffolding 5

EN39-EN10219 Scaffolding

Model:ZDP-5-8
Brand:Tianhong,Jili
Origin:Made In China
Category:Construction & Decoration / Pipe, Tube & Parts / Other Pipes & Tubes
Label:steel pipe , scaffolding , scaffolding pipe
Price: US $800 / Ton
Min. Order:5 Ton
Inquire Now

Member Information

Detail

ISO,CE,API,SIRIM

Free MemberHe Bei - China
Last Online:22 Dec, 2021

Product Description

 

Outer diameter 48.3mm
3.2mm/4.0mm
Pipe length 1.5ft,8ft,10ft,13ft,16ft.
2.SRL: 3-5.8m
DRL: 10-11.8M or as clients requested length
3.Fixed length (5.8, 6, 12m)
Standard EN39,EN10219,BS1139,JIS G3444
Material S235J0H,S355J0H,Q235L Q345L,STK400,STK500
Ends Plain ends
Surface treatment hot-dipped galvanized
Packing 1.Waterproof plastic cloth
2.Woven bags
3.PVC packing
4.Steel strips in bundles
5.As requirement
Applications 1.scaffolding and formwork system
2.For construction
3.ringlock scaffolding
4.scaffolding system
Payment and trade terms 1.Payment terms: T/T and L/C
2.Trade terms: FOB/CFR/CIF
3.Minimum quantity of order: 5MT (5000kg)
Delivery time 1.Usually, within10-20 days after receiving your down payment
2.According to the order quantity
Test Chemical component analysis, mechanical properties, technical properties, exterior size inspection, hydraulic testing , X-ray test
Advantages 1.Reasonable price with excellent quality
2.Abundant stock and prompt delivery
3.Rich supply and export experience, sincere service
4.Reliable forwarder, 2-hour away from port

1914105_1053592214697483_3540118228326916539_n1930780_1053591404697564_1283735545097138961_n1468727_1053591514697553_7716448520819227379_n

Outer diameter 48.3mm
3.2mm/4.0mm
Pipe length 1.5ft,8ft,10ft,13ft,16ft.
2.SRL: 3-5.8m
DRL: 10-11.8M or as clients requested length
3.Fixed length (5.8, 6, 12m)
Standard EN39,EN10219,BS1139,JIS G3444
Material S235J0H,S355J0H,Q235L Q345L,STK400,STK500
Ends Plain ends
Surface treatment hot-dipped galvanized
Packing 1.Waterproof plastic cloth
2.Woven bags
3.PVC packing
4.Steel strips in bundles
5.As requirement
Applications 1.scaffolding and formwork system
2.For construction
3.ringlock scaffolding
4.scaffolding system
Payment and trade terms 1.Payment terms: T/T and L/C
2.Trade terms: FOB/CFR/CIF
3.Minimum quantity of order: 5MT (5000kg)
Delivery time 1.Usually, within10-20 days after receiving your down payment
2.According to the order quantity
Test Chemical component analysis, mechanical properties, technical properties, exterior size inspection, hydraulic testing , X-ray test
Advantages 1.Reasonable price with excellent quality
2.Abundant stock and prompt delivery
3.Rich supply and export experience, sincere service
4.Reliable forwarder, 2-hour away from port

1914105_1053592214697483_3540118228326916539_n1930780_1053591404697564_1283735545097138961_n1468727_1053591514697553_7716448520819227379_n


Payment Terms:T/T,L/C

Product Image

EN39-EN10219 Scaffolding 1
Img 1
EN39-EN10219 Scaffolding 2
Img 2
EN39-EN10219 Scaffolding 3
Img 3
EN39-EN10219 Scaffolding 4
Img 4
EN39-EN10219 Scaffolding 5
Img 5

Send Inquiry to this Member

ISO,CE,API,SIRIM

XIYAOBAO VILLAGE, EAST OF JULIANG AVENUE NORTH EXTENSION LINE, CHENGAN COUNTY, HANDAN CITY, HEBEI PROVINCE, CHINA

Phone:
+8615-310-5231758
Fax:
中国-310-5231758
Contact:
David Lee (Sales Manager)
Mobile:
15690037690

Related Products of this Company

This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please click here.

China Suppliers Quick Searching:

Other Pipes & Tubes Made In China Products

,  

Other Pipes & Tubes China Suppliers and China Manufacturers