Model: | 750ml |
---|---|
Brand: | polyurethane foam sealant |
Origin: | Made In China |
Category: | Construction & Decoration / Building Sealing |
Label: | polyurethane foam se , polyurethane foam , pu foam sealant |
Price: |
¥1
/ pcs
|
Min. Order: | 1000 pcs |
Last Online:25 Oct, 2022 |
APPLICATION AREA:
gate,window frame packing and installment;crack and lack hole packing;dustproof,against harmful insect,against air infiltration's seal;air conditioning,platoon wind the fan's crack sealing;pipeline and sewer's sea;heat insulation,the sound-insulated;electric appliance switch-box's installment locates and insulates;the bathtub electric wire exports the crack packing;each kind of non-sign brittle goods quakeproof packing;roof the crack fill;waterpoofing and heat preservation;stops up each kind of harmful insect saliva to nip function;to stop up against mouse access duct,hole and so on
CHARACTERISTIC OF PRODUCTS
feed tank:+10℃-+30℃
Environment:+5℃-+30℃foam multiples:78times.
the best construction temperature:18℃to +25℃.
Curing temperature range:-40℃to +90℃.Dry Time 10 to
14 minutes Cutting Time 30-40 minutes This test data
obtained under laboratory conditions 23℃.50%RH
STORAGE
Please put this product without Kaifeng preserved in the +10℃
to + 30℃dry places. Prohibited near open flame or and
inflammable and explosive materials contact.
PRODUCTS APPLICATION
1.pre-construction,construction of the surface to remove floating dust,oil.andspray a little water in the surface construction.
2.cans will be expected to shake up and down several times.Material can be fixed on the gun upside down and rotate the connector.
3.material can be used upside down.Spray foam from the buttom up,in general,only 70-90% filled joints(slightly inflated the bubble will install)
4.Ten minutes after the start curing the suface,wait about 40minutes to remove excess foam.
5.This product in not UV,it is recommended in the curing of the foam surface coating with other materials,such as:cement,mortal,paint,etc.(24 hours to paint the construction).
Safety recommendations:
The product after curing, no harm to the human body. Construction please wear protective gloves, clothing,masks and goggles. The construction site must be ventilated. This product may cause eye, respiratory system,skin discomfort. Accidentally inhalation or skin contact may cause irritation symptoms. Prohibit near open flame or contact with flammable and explosive articles, no smoking. Do not inhale vapors. If swallowed immediately sent to hospital. The inadvertent inhalation after stimulation symptoms should be immediately transferred to the fresh air and see the doctor. Avoid direct sunlight, in a cool and dry place, and the temperature does not exceed 50℃. After the use of prohibited burning or piercing empty cans. Please put paint on the place where children can not reach
Eric
Sales director
JINZHU Industrial Co., Ltd
Whatsapp:0086-18631858821
wechat:18631858821
Skype:pu_foam
Email:jiazhusealant@163.com
www.jzsealant.net