Model: | PMY03 |
---|---|
Brand: | NTEC |
Origin: | Made In China |
Category: | Textile & Leather / Textile Materials / Yarn Materials |
Label: | - |
Price: |
US $2.92
/ kg
|
Min. Order: | 1000 kg |
Last Online:26 Sep, 2023 |
Polyester Mono Yarn for 3D Spacer Mesh Fabric
Material:100% polyester chips
Diameter:0.10-0.30mm
Color:White,Semi Dull,Dull
Features:High strength, durability and chemical resistance
Application:Sandwich mesh,3D spacer fabrics,shoes fabrics
Detailed Images
Features:
High tensile strength High heat-resisting property Low moisture-absortion property Excellent machinability and abrasion resistance
Application
Applications |
Computerized Embroidery |
Manually Embroidery |
Handicrafts , Tassels |
Lace Embroidery |
Garment Accessories |
Knitting , Weaving , garments and shoes |
fashionable leather products |
safety belts |
|
electronic goods, leather shoes, clothes shoes, straps, handbag, toy, basketball, football, kite, net pipe and triangle straps and employee's card straps |
Packing & Delivery
Company Profile
1.Our company has more than 10 years in this field, so that we can make sure the good quality of products.
2.We have our own factories and production equipments, so that we can promise a short lead time(10-25days).
3.We are the direct manufacturers, so that we will give you a reasonable price as far as possible.
4.We have been cooperated with many countries in the world, and we hope to estalish cooperation relations with more and more
countries in the world.
5.Of course, your business relationship with us will be confidential to any third party.
FAQ
Q1:Can we get the sample for reference?
A:Samples can be sent to you to check the quality by free,but you should pay for the express fee.
Q2: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.
Q3: How can we guarantee quality?
A:Always a pre-production sample before mass production;
Always final Inspection before shipment
Q4: What is your terms of payment ?
A: Payment by T/T (30%advance and 70% before loading container) or L/C at sight.
Payment Terms: | TT/LC |
---|---|