Model: | SJF-85 |
---|---|
Brand: | JYF |
Origin: | Made In China |
Category: | Agriculture & Foods / Processed Food / Starch |
Label: | Starch Making , Starch Extraction , Full Electric |
Price: |
US $160
/ pc
|
Min. Order: | 100 pc |
Payment Terms: | TT/LC |
Last Online:21 Sep, 2025 |
Matching Power
1.8-3 KW copper core motor or 170F gasoline engine (rotation speed: 2800 rpm)
For the motor, a copper core wire with a cross-sectional area of no less than 3 square millimeters must be used.
2. Connection Requirement
The wire must be connected directly to the switch under the electricity meter; plugs are not allowed. Failure to provide the rated voltage required by the power may burn the wire or the motor.
3. Application & Features
Used for grinding sweet potatoes, potatoes, Chinese yams, lotus roots, kudzu roots and other root crops.
Features a simple structure and pulp-residue separation function, with a pulp-residue separation rate of over 95%.
Main Technical Parameters
Item |
Specification |
Item |
Specification |
Grinding Shaft Speed |
2200 r/min |
Separation Shaft Speed |
1000 r/min |
Working Efficiency |
500 - 800 kg/h |
Matching Power |
1.8KW - 3.0KW |
Motor Wheel |
60 - 70mm |
Single Machine Weight |
≥30 kg |
Separation Effect |
≥95% |
Powder Content Rate in Residue |
≤5% |
Tooth Height |
1.2 - 1.5mm |
Filter Screen |
80 - 100 Mesh |
Overall Dimension |
850mm×350mm×1030mm |
|
|
Belt Model |
Square barrel: 1295A - 11321A; Round barrel: 1194A - 1200A |
|
|
Processing Items |
Sweet potato, potato, Chinese yam, lotus root, Pueraria |
|
|
Installation & Commissioning
1. Before installation, read the instruction manual in detail and carefully check whether all components are intact. Install the main machine and motor bracket in the direction shown in the diagram.
2. Install the entire machine stably with an inclination of no more than 10 degrees, and fix the bottom bracket firmly.
3. Fix the power unit on the frame, and adjust the appropriate distance between the power pulley and the machine's pulley.
4. Connect a suitable water inlet pipe, as well as appropriate wires and a switch.
5. Before using the machine, check whether the shafts of the entire machine run smoothly, fasten all bolts, and ensure the materials are clean.
6. When starting the machine, if excessive noise or vibration occurs, stop the machine immediately for inspection. Only start working when the machine runs stably and normally.
7. If the water seal of the secondary water inlet elbow leaks during operation, the water pipe can be removed and blocked to stop water inflow. As long as the main water inflow is sufficient, the filtering effect will not be affected.
Note: After each operation, do not stop the machine immediately. Continue to supply water for 2-5 minutes and block the powder outlet pipe at the same time until the residue inside the filter screen is cleaned. Only then can the machine be stopped; otherwise, the filtering effect of the filter screen will be affected.