Marine multiple T - profile production line
Product Description
T used in the domestic shipbuilding steel production, mostly single, slow, inefficient, high labor intensity, can only process a number of light and small T-shaped steel. Multi-stage gantry T beam production line can solve these problems, but such welding technology only a few in Japan and other developed countries have applied a small number of large shipbuilding enterprises in China is to buy the equipment from foreign countries (Japan exclusive monopoly), but expensive (12 million / unit), and features a single, long lead. To this end the company based on the actual conditions in the domestic industry first developed a highly efficient, high-speed, low cost, high performance platform for 24-pole steel gantry T welding production lines. The product of the PLC programmable controller and inverter to control the entire production line, and the welding speed and welding speed adjustable pre-set function, uniquely developed six T profile 24 forming a welding electrode T Steel Platform welding production lines. The line is compact, easy operation, high efficiency, saving space and personnel, is the bulk, high-speed forming a welded T sections of large equipment.
Product Image
Img 1
Img 2
Send Inquiry to this Member
Related Products of this Company
This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please
click here.
China Suppliers Quick Searching:
,