Product Description
Method of use: air and hotline
Use air and hot line, the first step according to the size of the first space heating, 15 cubic meters per kilowatt calculated grain of the needed add hotline number, namely plus hotline number n = heating space V / 15 cubic meters (n is rounded). Then according to the length of the space heating or width reasonable choice and hotline, again add hotline at the space distribution, back and forth general line spacing for 20 cm shall prevail (such as the heating temperature is not high, can add the line spacing) wiring, first in greenhouse on both sides width direction according to the selected wiring with sticks, and then insert spacing line in wood holding on to kickbacks and pulling taut. If produce add hotline too long or too short, can still sticks to adjust. Pull out flexible Also can keep spacing in the condition of constant, allow the halfway back to achieve the conductive line with hotline at the same side, easy to pick up the power supply. When the air and water use in small hotline, also can consult the wiring method. But the number needed to add hotline should press n = v / 7 cubic meters calculation.
Payment Terms: | Electricity discussion |
| |
Product Image
Img 1
Img 2
Send Inquiry to this Member
Related Products of this Company
This member assumes full responsibility for the content of this listing. DIYTrade accepts no responsibility whatsoever in respect of such content.
To report fraudulent or illegal content, please
click here.
China Suppliers Quick Searching:
,