3000TPH Skid Mounted Open Pit Mine Coal Crushing Plant

3000TPH Skid Mounted Open Pit Mine Coal Crushing Plant
Model:PSZ
Brand:CCRB
Origin:Made In China
Category:Industrial Supplies / Mining Machine
Label:Coal Crushing Plant , Coal Crusher Plant , Crushing Station
Price: US $160000 / pc
Min. Order:1 pc

Product Description

3000TPH Skid Mounted Open Pit Mine Coal Crushing Plant

Introduction:

Skid Mounted Open Pit Mine Coal Crushing Plant mainly crushes raw coal mine from opencast working, passes the primary crushing, secondary crushing, even tertiary crushing, then enters into screening system, finally reaches the customers’specified size. The whole production line includes Crushing system, Screening system, Feeding system, Conveying system and Electrical system, etc. Please see the following:

Crushing System(Include feeder breaker&coal sizer)

Scraper Feeder BreakerCoal Sizer

Screening System(Include linear vibrating screen&circular vibrating screen)

Linear Vibrating ScreenCircular Vibrating Screen

Feeding System(Include vibrating feeder&belt feeder)

Vibrating FeederBelt Feeder

Conveying System(Belt Conveyor)

Belt Conveyor

Advantage:

  • Super processing capacity, reach maximum 3000 tons per hour.
  • Diversified product granularity, compact structure and stable operation.
  • Quick installation and adjustment, convenient civil engineering and steel structure construction.
  • Coal crushing plant key component adopts international famous brand to ensure efficient work.
  • With complete electrical and monitoring system, PLC remote control and high intelligence.

Coal Crushing Plant Technical Parameters:

Model

PSZ300

PSZ500

PSZ1000

PSZ1200

PSZ2000

PSZ2500

PSZ3000

Input Size

(mm)

≤500

≤700

≤1200

≤1500

≤1800

≤2000

≤2000

Output Size

(mm)

50-80

80-150

≤300

≤300

≤300

≤300

≤300

Capacity

(t/h)

300

500

1000

1200

2000

2500

3000

Project Engineering:

Baishihu Open Pit Coal Mine of Xinjiang Guanghui Energy Co.,Ltd

2500t/h Open Pit Mine Coal Crushing and Screening Plant:

Project Engineering_Coal Crusher PlantProject Engineering_Coal Crushing Plant

Basic Process:

Raw coal bunker→Feeder breaker(apron feeder and single roller crusher)→Belt conveyor→Secondary crusher(coal sizer)→Vibrating screen→Lump coal/Powder coal→Finished coal bunker→Truck loading

Basic Process_Coal CrusherBasic Process_Coal Vibrating Screen

Installation and Delivery:

Strict site three-level quality inspection system

  • Installation captain inspection: Evaluate the installation level of coal crusher plant.
  • Spot QA engineer inspection: Inspect the whole installation process and key components.
  • Service engineer inspection: Inspect the deb ing and running condition of whole production line.

Training System:

Provide professional staff training for customers

  • Service engineer offers spot training and production line operation manual.
  • After-sales personnel visit customers on a regular basis.
  • Design engineer provides professional service for customers for free.

Training System_Coal Crusher StationTraining System_Coal Crushing Station

FAQ:

1. If the spot coal dust is too much, how to solve?

We can add the dust collector in the whole production line to avoid dust pollution.

2. If the mining area sand wind is too large, what should be noted in the coal crusher plant?

We should note the strength of steel structure, design the reasonable strength of steel structure.

3. If the mining area always rains, how to ensure the production line normal operation?

We can design and add rain cover above all equipments.

4. If the mining area is located in a high altitude, what should be paid attention to?

Electrical system should be specially noted, we can provide special electrical motor and relevant control device.

5. Which kind of types this coal crusher plant has?

Generally two types: Mobile type and Semi-mobile type.

6. What is processing capacity of this production line?

From 300t/h to 3000t/h capacity.

7. Is this production line full-automatic?

Yes, full-automatic production, operate all equipments by control room.

8. What is the guarantee period of production line?

One year, during the guarantee period, provide after-sale service for free.

9. How to transport and install this production line equipment?

All equipments joint is adopted bolt connection, convenient assembling, easy to transport.

Service engineer guides installation and trains staff in construction site.

10. What is the delivery term?

It is about 40-90 working days according to different scale of production.

11. What is the payment term?

T/T or L/C.

12. What is the port of shipment generally in China?

Shanghai, Tianjin or Qingdao.

Related Products:

Portable Jaw Crusher&Impact Crusher

Portable Jaw CrusherImpact Crusher

Cone Crusher&Sand Making Machine

Cone CrusherSand Making Machine

Impeller Sand Washer&Spiral Sand Washer

Impeller Sand WasherSpiral Sand Washer

Company Information:

Feeder Breaker ManufacturerFeeder Crusher Manufacturer

3000TPH Skid Mounted Open Pit Mine Coal Crushing Plant 1

Member Information

China Coal Rainbow Group
Country/Region:He Nan - China
Business Nature:Manufacturer
Phone:13569892715
Contact:Bill Lau (Sales Manager)
Last Online:22 Aug, 2017