1) Speed of construction, 4 days per floor construction cycle.
2) Formwork can be re-used over 250 times.
3) No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.
4) Very high quality of finish, so good that walls only need a 3 to 5mm skim or putty coat plaster to achieve a perfect finish. No heavy backing plaster.
5) Externally, a good quality textured paint applied provides a high quality finish, again no plastering required.
6) Ceramic tiling can be fixed directly unto the formed concrete finish, again no plastering required to straighten the walls.
7) No scaffolding required to construct the concrete structure as we provide integrated working platform brackets to work off.
8) We provide sunken drops to floor and pipe chases to walls if required as part of our complete package.
9) M & E 1st fixes are incorporated with our system.
10) We offer a complete redesign service of your formwork into your next project maximizing the number of re-uses.