ERW Steel pipes |
O.D |
O.D tolerance |
W.T |
Thickness Tolerance |
10-273 mm |
±0.5mm |
0.5-20mm |
±10% |
Standard |
ASTM A53/ASTM A36/ BS1387/BS1139/EN39/EN10219/EN10217/EN10297/EN10296/EN10025 |
Material |
Q195/215/235/345 |
Length |
1-12M , according to customers' requirements |
Certificate |
ISO9001-2008,EN10210,API,Raw material cert,Mill cert,Reap on site inspection report,SGS,BV |
Standard |
JIS G3444 |
ASTM A53/ASTM A36 |
BS1387/BS1139/EN39/EN10219/EN10217/EN10297/EN10296/EN10025 |
DIN EN10216,DIN EN10208,DIN EN10217, DIN28180,DIN17175, DIN EN10305, DINEN 10025 |
Material |
Q195/215/235/345, |
SS330/400/500, |
S235JR/S235JQ/S235J2, |
STK290,STK400,STK490,STK500,STK540 |
Inspection |
With Hydraulic Testing, Eddy Current , Infrared Test |
Technique: |
Welded:Cold drawn,Hot rolled,heat extrusion |
Packing |
In bundles or according to customers' requirements |
Usage |
For construction, Pluid and Greenhouse |
Main market: |
Middle east,North and South America, East and West Europe, South and southeast Asia,Australia,Africa, |
Place of Origin |
China |
HS code: |
73063090 |
Productivity |
5,000,000tons/year |
Processing |
galvanzied,inner and outer stab clean,bevelled |
threading,with coupling and plastic caps protected |
packing in plastic cloths,3PE,FBE,corrosion resistant coating |
Remarks |
1)Payment term : T/T, L/C |
2)Trade Terms : FOB / CFR / CIF |
3)Minimum quantity of order:10MT |
4)Delivery period :15 to 30 Days . |