steel tube assembly

steel tube assembly
Model:HBGG001
Brand:HB
Origin:Made In China
Category:Transportation / Car Parts & Components
Label:steel tube , steel tube assembly , tube assembly
Price: US $0.4 / meter
Min. Order:10000 meter
Inquire Now
点击这里给我发消息

Product Description

steel tube assembly

Single Wall Copper Coated Steel Tube/Bundy Tube -1

Add to Basket Add to Product Favorites ShareGoogleRedditDeliciousStumbleUponProduct Description

1. Reference Standards:
ASTM A 214/A 214M-96, ASTM A 254-94.


 

2. Application:
It is widely used in refrigeration industry, condenser evaporator CF refrigerator and icebox, car-oil delivery pipe, heat pipe etc.

3. Materials:
BHG, SPHC, SPHD, SPHE, SAE1006, Q195-Q235 etc. Or can be optional according to customers' requirements.

4. Features:
No stain, smooth surface, high intensity, good plasticity, strong corrosion resistance, small resistance.

5. Dimension tolerance, Mechanical properties, and Chemical composition:
Please refer to relevant standard or contact us.
Specification range: OD: 4.0mm-18mm. WT: 0.5mm-1.0mm.
Surface Coating: Copper, Zinc, PVF inner or outside.

6. Coating and Lining:
Pipes Coating is fundamental for protecting the pipe against corrosive environment and the pipe's life-length depends directly on the coating. Our manufacturers apply different types of coatings and linings in accordance with major standards in order to fulfill our client's requirements.
I   Polyethylene coating (PE):
PE coating is extremely efficient against corrosive and aggressive environments and chemical materials. PE coating is applied in accordance with DIN30670.
Ii   Bitumen Coating and Lining:
Bitumen coating and lining is applied in accordance with DIN2461, DIN30673, BS41-64, BS41-47, etc.
Iii Epoxy Coating and Lining

7. Packing:
First we adopt plastic film to warp the small bundle and then seaworthy wooden case will be used to protect the goods well.

8. Distribute area:
Singapore, Italy, Greece, Vietnam, Egypt, Iran, Spain, India, Israel, Mexico, Pakistan, Sandi Arabia, Bangladesh, USA, Morocco, Indonesia and so on.

Terms:
Package Terms:
I First we adopt plastic film to warp the small bundle and then seaworthy wooden case will be used to protect the goods well.
Ii Delivery Time: 30 Days A. S. A. P.
Iii Payment Terms: 30% down payment, the rest should be paid before shipment, Other payment can be negotiated.
Special Design can be customized by our clients' requirement.
Warmly welcome contact our company, We will supply to you qualified products and best service, and establish long term cooperation.
If you have any inquiries about our products, please do not hesitate to contact us.
Best regards,
Catherine
Holy base group limited
email:holybasegroup@gmail.com
msn:worldtraderita@hotmail.com
Yahoo:worldtraderita@yahoo.com
skype:holybase01
 

Payment Terms:TT/LC
steel tube assembly 1steel tube assembly 2steel tube assembly 3steel tube assembly 4steel tube assembly 5

Member Information

Holy base group limited
Country/Region:Shan Dong - China
Business Nature:Manufacturer
Phone:18661705329
Contact:Catherine (sales manager)
Last Online:18 Jul, 2023