The whole line uses an 8 stations linear layout; The curing station is for eight; with the relative box, preheating, two-way carriage, automatic filling; after consolidation the cabinet is transported out, and then use the same transporting line of out box.
The production line includes: 8 sets of foaming fixtures, a two-way delivery systems, an automatic filling system, a set of preheat oven, preheat oven roller conveyor line, the one into the box clamp recognition machine, out of the box top l pan conveyor, roller conveyor line of out of the box (about 8 meters), the outer mold water heating systems, the internal model heating system, retooling car, security ventilation systems, electrical control system 13 parts in total. the line is ended from the beginning of preheating baker to out box roller conveyor line.