Model: | HHT9401GFL |
---|---|
Brand: | Hongtai |
Origin: | Made In China |
Category: | Transportation / Vehicles / Special Transportation Equipment |
Label: | powder tanker , powder semi trailer , powder trailer |
Price: |
US $16000
/ pc
|
Min. Order: | 1 pc |
Specification
Overall dimension: 12980*2480*3850
net volume:35m3
Total weight:37560kg
Pay load:25000kg
Output:air pressure system
Rate work pressure:0.2MPa
Material:Q235B or Q345B
Shape:Bi-pyramid V shape structure
Chassis:
Axle: 3 piece of 12 or 13 TON BPW, FUWA or YONGLITAI
Front suspension:-/2230,-/1730
Rear Track:1840/1840/1840
Number of Leaf Springs(front/rear):-/10/10/10,-/8/8/8
Landing gear:Jost double speed manual operation or other
Kingpin:Jost 2" or 3.5"
Suspension:FUWA mechanical tri-axle suspension with 16*90 8-leaf springs
Pneumatic braking system:a system with emergency brake and parking brake ;one unit of WABCO RE 6relay value;four unit of T30/30spring brake chamber;one unit of 40L air tank;two unit of standard copper air-connector
Wheel rim:8.25R22.5 or other type on sale
Tyre:triangle ,Ling Long ,Double Coin or other equivalent brand
Air Compact system
Engine:4100AG diesel
Filtration and pressure control:included-at the outlet of the air compressor
Air outlet system:2"main hole,2"check valve,1.5"safe valve,0.4Mpa gauge
Guard system
Guard on top of the tank:checkered plate
Side guard:Cross bar-structure
Rear bottom guard:fixed type
Discharge system
Discharge:4" seamless steel tube at bottom of funnel and through the top of axle
Quadratic blow:Same direction as discharge tube,1"diameter,with ball valve and check valve
Discharge valve:4"disc valve fixed inside middle of rear guard
Pipeline cleaning equipment:at the beginning of discharge tube
Tank cleaning equipment:11/2" rubber flexible hose
Other:
Ladder:1 or 2 at front or rear or both ,bolted or welded
Tool box:one box with selectable dimensions
Lights and wire:one unit of 24V 7pin with lights
Painting:Sand blasting processing on rust cleaning
One coat of anticorrosive
Two coats of finish urethane paint
Colour as customer required
Spare part:
Alloy manhole cover
Flange for manhole rack unloading valve
Oil and gas recovery joint
Built-in respiration valve
Respiration valve
Oil monitor
Price Terms: | FOB Tianjin |
---|---|
Payment Terms: | TT/LC |
Packing: | Wax before shipment by container or bulk cargo ship or Ro-Ro |
Lead Time: | 30 to 60 days after confirmation |
Standards Certificate: | CCC/ISO/SGS/CIQ/BV |
Hebei Hongtai Special Truck CO.,Ltd | |
---|---|
Country/Region: | He Bei - China |
Business Nature: | Manufacturer |
Phone: | 03275900 |
Contact: | Bella (Regional Manager) |
Last Online: | 11 Mar, 2014 |