Model: | TOP2000C |
---|---|
Brand: | Shenhua |
Origin: | Made In China |
Category: | Industrial Supplies / Machinery / Welding Machinery |
Label: | welder machine , seaming machine , banner welding machi |
Price: |
US $900
/ pc
|
Min. Order: | 1 pc |
1. Introduction:
Thank you very much for choosing our “Automatic TOP2000C Hot Air Welder”. We believe that this will be your best choice for your business. This equipment is designed professionally for seaming PE , PVC and painting banners.
To help you understand the characters features of this equipment and know how to operate safely and keep in good condition etc. We give you THE MANUAL OF INSTRODUCTIONS for your reference. Although the machine is produced well and passed the strict quality examination in our factory before we deliver the machine to you, the effects of the function will be absolutely caused by the improper operation or without complete maintenance. For the reason of safety and the excellent performance of the machine, please read and follow the directions before operation. Please keep in mind that all the danger would be caused by carelessness and not reading the manual carefully.
2. General instruction for safety:
Warning: The basic principal of safe protection should be followed to reduce the danger of fire in disaster, electric shock and personal harm. Please pay attention to the following items carefully before operation.
1. Keep the working place clean. Messing up and the disorderly working place cause disaster
2. Choose the work place carefully and use the machine in a bright and dry circumstance.
3. The electricity, controlling box and protective facilities have to be in the proper order after finishing daily work. The electrical power supply has to be switched off definitely.
4. The machine has to be stopped before gets maintenance or replacing the parts.
5. Use standard or indicated tools when dismantling or replacing parts.
6. For safety and the long life of the machine, please do not let the machine operates overtime.
7. If any special incidents happened, please stop the machine first for repairing, And do not deal with the special incident with improper procedures.
8. If the machine is operated on land, keep the work place clean and no dust there. If dust or something blocks the inhaling filter of heater, the heating wind can not come cut adequately and then temperature inside of filter will rise to let the heater burn down.
3 Moving,Dismantlement,Installation,Cleaning:
1. Any part of this machine being bumped of fallen can cause some damage impossible to be repaired.So please pay attention to carry it.It is s ested to move the machine by manpower and put it down carefully.
2. Please check if there is damage or missed parts after unpack the machine.Any problem, please contact us or the local agent immediately.
3. The place for installation must be flat and the floor is strong enough to support the machine and moreover, the installation place should close to power supply.
4. Keep the installation place no dust and avoiding sunshine.
5. Please sweep away the anti-rust oil from the machine with detergent and re-lubricate with light lubricating oil after installation.
4 Connecting the power supply:
Connecting the electric wire to the reserved plug(AC220V)of controlling box.
5 Operation:
1. Make the cloth for seaming flat and put it underneath.Fix both ends by adhesive tape or something else.
2. The overlap width of the two pieces is about 3-mm, the width of the nozzle of hot seaming machine.
3. Put the machine nozzle between two overlap pieces.The press-wheel should be at left side of nozzle.The nozzle also need align with side of upper piece of cloth.
4. Switch on the motor power and then adjust speed.
5. Turn on the movement switch.
6. Press heating power key to adjust temperature.
7 Turn the bar by anticlockwise to fix the position to startup automatic movement.The machine will go along with the overlap path by itself.
8. Turn the bar by clockwise to cease the automatic work.
9. The operator should control the moving direction and make sure the nozzle connect both with upper and under piece of cloth.
6 notice:
1. During operating, if the surface cloth is dissolved and scorched or the cloth are not sticked together, please stop to adjust the temperature or speed.
2. During operating,if the seaming part is not in right position, please stop to adjust fixing position.
3. During operating, make sure clothes are flat so that stick together smoothly.
4. The hot wind of heater cannot touch the press-wheel or the rubber of press-wheel is easy to be burned down.
5. Adjust temperature to zero before turn off the heater.Switch off after 5-10 minutes.
7 Maintenance:
Take care the nozzle.Use brush to clean if there is dust or block in the nozzle or filter.
8 Specification:
Electric heating:1600W
Motor:15w
Voltage:220V/230V
Frequency:50/60HZ
Temperature scope:20-600 Degree
The thickness of material to be weld:0.2-2mm.
Welding Area:3cm
Working Temperature:400degree(normally)
Specification: L:50cm, W:30cm, H:28cm
Net weight:14kgs
Gross Weight:15kgs
Packing size:495*295*35mm
Package: Hard plastic case with carton outside
Zhengzhou Sixth Great Co., Ltd | |
---|---|
Country/Region: | He Nan - China |
Business Nature: | Manufacturer |
Phone: | 68860305 |
Contact: | cici wang (sales) |
Last Online: | 13 Aug, 2014 |