Best useful Rail gap adjuster used for railway

Best useful Rail gap adjuster used for railway
Model:-
Brand:BAFANG
Origin:Made In China
Category:Metallurgy , Mining & Energy / Metallurgy & Mining / Flat & Rolled Metallic Materials
Label:Rail Adjuster , Rail Joints , Rail Joint Gap Adjus
Price: US $1000 / pc
Min. Order:1 pc
Inquire Now

Product Description

Product Introduction

YTF-250 rail joints checked before Used:..


a. whether the oil level in the tank reaches two-thirds of the tank height
b. return valve effect is reliable
c. pull wedge mechanism is flexible and reliable
d. loose parts of the connections are tight and leak


YTF-250 rail joints steps:
1 Push the rail joints rail joints to be adjusted
2 pull moving frame, so that the two clamps (wedges) falls on rails, so that the oblique iron rails folder in prison
3 Tighten the oil return valve clockwise, rocking lever, so that the high pressure oil input operating cylinder
4 When after each adjustment shall order first unscrew the oil return valve

Technical Parameters

Model

YTF-250

YTF-400

rated thrust

250KN

400KN

Oil Cylinder Maximum Trip

145mm

140mm

operating oil pressure

43mpa

52mpa

The maximum operating force controller

260N

400N

Dimension

850*300*290mm

850*300*290mm

N.W

55kg

80kg

Best useful Rail gap adjuster used for railway 1Best useful Rail gap adjuster used for railway 2Best useful Rail gap adjuster used for railway 3Best useful Rail gap adjuster used for railway 4Best useful Rail gap adjuster used for railway 5

Member Information

JINING BAFANG MINING MACHINERY CO.,LTD
Country/Region:Shan Dong - China
Business Nature:Trading Company
Phone:15020762350
Contact:Zhang (Sales Manager)
Last Online:19 Nov, 2014