Ce Approval Led Bulb Light 18w 4ft Led Tube Light

Ce Approval Led Bulb Light 18w 4ft Led Tube Light
Model:-
Brand:holimould
Origin:Made In China
Category:Consumer Electronics & Lighting / Lighting / LED Lighting
Label:Led Bulb Light , Led Tube Light , Ce Approval
Price: US $1 / pcs
Min. Order:200000 pcs

Product Description

Welcome to see our LED light Bulb Home

 

2015 High quality CE RoHS Approval led bulb light 18w 4ft led tube lights www .xxx co 

 

Products details:

 

led bulb light 18w 4ft led tube lights www .xxx co

1) LED Bulbs with unique shapes and design
2) LED : SMD 4014 Epistar chip led light bulb
3) voltage : 220-240 AC 
4) 3w of led light bulb.

 

More Picture of led bulb light 18w 4ft led tube lights www .xxx co .

 

 

 

 

The Related Led Lights Buld:

Packaging & Delivery

 

Unit Package Size (mm) 63(L)*63(W)*117(H)
Package Weight 110g
Inner Box Size (cm) 32.4*13.2*13.5
Inner Box Quantity 10
Inner Box Weight 1.15kg
Carton Size(cm) 67*33.4*14.5
Carton Quantity 60pcs/outer
Carton Weight 12.5Kg
Loading Qty. 20’/40’/40HQ 46597/96523/113165
Safety Approval ROHS, CE(EMC & LVD), REACH, Erp
Price ( FOB ) USD

 

 

 

Application of the Led Light Bulbs:

 

 

 

led bulb light 18w 4ft led tube lights www .xxx co

1) Building (architecture or home) decoration

2) Home using

3) Amusement park and theater lighting

4) Emergency hallway lighting

5) Shopping mall, restaurant, hotel, meeting room and advertisement signs backlighting

 

Shippment :

 

Process of making moulds
1.Sample/Drawing After receiving your detail information like 2D & 3D drawings or sample for reference, will pass to R&D team to do moldflow analysis.
2.Negotiation Material, cavity, price, delivery time, payment term, etc.
3.Place Order when all terms are agreed by both sides, then we will accept an order.
4.Mould Design Our R&D team will design the mould per customer requirements and send drawings for approval.
5.Tooling Mould Once the mould design is approved will start mould tooling.
6.Mould Process CNC grinding and milling, Heat Treatment, Wire Cut, Polish, Tool assembling and testing etc. Our good QC system can guarantee the product quality.
7.Sample Confirmation Send sample for confirmation, if not approved we will adjust the mould structure.
8.Mass Production After customer approves the sample, we will arrange mass production. QC will inspect after products finished.
9.Package PE film for plastic parts, wooden case for moulds or as customer's requirement. QC will inspect packing.
10.Delivery By sea or by air according to customer requirement.
11.After-sales Service Ready to help customers solve any possible problems

 

Payment Method :

 

T/T, Western Union, MoneyGram, Paypal

 

Our Factory :

 

 

 

 

 

Our company :

 

 

Remarks (1)Life Span :>30, 000hrs &Different body color for your chose
(2)Warranty: Two years after delivery &Different body color for your chose
(3)Terms of payment :30% deposit.70% by TT before shipping dates.
(4)Package: 1pcs/white box, 100&50pcs/outbox
(5)Delivery Time:45 days after the sample confirmation in the first order, 30 days for second order
(6)The valid time of price :3months
 
Payment Terms:TT/LC/PAYPAL/MONEYGRAM
Ce Approval Led Bulb Light 18w 4ft Led Tube Light 1Ce Approval Led Bulb Light 18w 4ft Led Tube Light 2Ce Approval Led Bulb Light 18w 4ft Led Tube Light 3Ce Approval Led Bulb Light 18w 4ft Led Tube Light 4

Member Information

Xiamen Holi Mould Co.,LTD
Country/Region:Fu Jian - China
Business Nature:Manufacturer
Phone:7623378
Contact:sophia (Plastic lamp cover m)
Last Online:04 Mar, 2015