Model: | sjy |
---|---|
Brand: | true win |
Origin: | Made In China |
Category: | Industrial Supplies / Construction Machine |
Label: | Additive telescopic , aerial work platform , Factory building ele |
Price: |
US $500
/ pc
|
Min. Order: | 1 pc |
lift:
Is a kind of shear fork hydraulic lift platform Products are mainly used for two, three, four layers such as 15 meters between high-rise industrial workshop, restaurant, wine shop floor of cargo delivery, have a single column and double column, the four pillars, and other forms, smooth operation, the operation is simple and reliable
Safety:
The overflow valve:
Emergency manual valve
hand pump
Pipeline rupture valve
Tank of the oil temperature protection
Civil engineering advantage
1, above the shaft without machine room, top height 3.5 meters can be installed.
2, room is located in the shaft radius 15 meters, occupies an area of only 3-4 square.
3, hydraulic elevator is not set for heavy equipment, improve the utilization efficiency of shaft area.
4, hydraulic elevator load and load through the cylinder direct effects on foundation pit, shaft strength requirement is low, brick structure or the brick structure well
maintaining
Hydraulic elevator guide rail type when used in our daily life should pay attention to maintenance, prolong the life of it. Understand the mechanical equipment maintenance and maintenance problems:
1. The mechanism of the brake should regularly check and adjust the brake block and the clearance between the brake wheel, flexible and reliable. On the friction, there should be no dirt, in case of dirt must wash with gasoline or thinners.
2. The reducer, gearbox, the outer meshing gear and so on various parts of the lubrication and hydraulic oil are conducted in accordance with the requirements of lubrication in the table.
3.Check the connection of the ministries, such as loose should be tightened. The connecting bolts should be in body check elasticity while compression (can adopt the method of rotating arm to cause compression state), all connections slightly shaft must have a split pin, and need to open fully.
5.Have met motor overheating to stop in time, troubleshooting and then continue to run the motor bearing lubrication is good.
Payment Terms: | TT/LC |
---|---|
Shandong true win construction materials co.,ltd | |
---|---|
Country/Region: | Shan Dong - China |
Business Nature: | Trading Company |
Phone: | 85942228 |
Contact: | jacezhang (manger) |
Last Online: | 28 Jan, 2016 |