Product Description

Powder soot bulk loader is used mainly as the powder soot bulk loading of electric power station and cement bulk loading of cement industry. The main characteristic which is different from the general bulk loaders is that the materials are separated from the drawing mechanism fully. This advantage can not only improve the efficiency of running and durability of equipment, but also facilitate the dust filtering. This equipment, discharging device, air slide,vibration hopper and other feeders are combined to become an automated bulk loader up to truck and ship with a fully automatic control system. The entire process is conducted in the sealed state, which is effective to prevent dust from escaping.
Main structure and working principle


1. Scalable bulk loader
Powder soot bulk loader is composed of transmission frame, hoisting device, transmissiondevice, losing rope device, channel steel block, level meter, filtering fan, the discharging pipe, filtering tubes and bulk head. The material flows into the tank through the discharging pipe based on its deadweight. The dust between the discharging pipe and filtering tube is sucked into filtering bag or ash silo by the filtering fan. The discharging pipe and filtering tube is scalable. Bulk head movement is achieved by the hoister driving system, safety controlling devices and losing rope device with declining and increasing of the scalable tubes.
2. The declining head of the dry ash bulk loader has an outside liner of rubber layer which achieves a tight seal with the tanker inlet.
3. The declining head is biconical structure. After lifting, the material outlet will be automatically closed.
4. Level meter is equipped with the solid tuning fork limited switch which is imported. It is sensitive, accurate and reliable with good quality.Main technical parameters

project SZJ-100A SZJ-150A SZJ-200A
discharging capacity t/h 100 150 200
discharging pipe diameter Φmm 219 273 325
inputting pipe diameter Φ 400 400 400
bulk loader head distance mm 1300~3000
lifting and falling speed of bulk loader head m/min 6.6 6.6 6.6
size(L*W*H) mm 2286×1050×900
total weight t 0.85 0.9 0.95

Installation and Commissioning

 

1. After installed, empty running is carried out by manual operation firstly to observe theflexibility and stability of bulk loader head with its up and down driven by hoister device. If everything is running well, the next test step is followed.
2. The test of losing rope limit switch: the bulk loader head is declined to the max. distance to make it being sealed with the material tank of the truck. When the bulk loader head is declined further, the steel rope is in relaxation state, so the losing rope limit switch should send out a signal.
3. Bulk head end limit Switch commission: when the bulk loader head is lifted up to the limited suspension height, the up limited switch of hoist device sends out a signal to stop moving of bulk loader head.
Operation;
after delivery vehicles is in loading place, the bulk loader head is declined by the semi-automatic controlling devices. After the bulk loader head is sealed with the top part of truck inlet, automatic controlling device start to work, i.e. fan is open automatically; the upper feeder then is open to begin discharging material into the truck. When the material tank is full, level meter sends a signal and the top feeder is shut down automatically by the corresponding electric control and gas control system. After a short time delay (usually four to six seconds),filtering fan is shut down automatically and bulk head is lifted. A completed discharging process is finished finally.
Feeder and filtering fan are locked and closed mutually during loading and discharging process, i.e. when the implemented by former, the latter can not open or close. It is necessary to unlock the interlock to change the above sequence.

Attentions
1. When operating, the outlet of bulk loader head should be sure to align to mouth of the tank,
otherwise there will be potential accidents of materials overflow.
2When great dust emission suddenly happens during loading, it means that the process of
exhausting material is not smooth. Stop loading immediately and not lift bulk loader head.
3. If the bulk loader head has been declined and wire rope is loosed, the hoister must be
stopped in order to prevent any potential incidents caused by too loose rope. If the indictor
light is not on when the bulk loader head has fallen to regulated position, it means the switch
of losing rope is out of control. Stop feeding immediately, lift bulk loader head and exam it.
4. If the full time of loading is expired, but level meter doesn’t send a signal, stop discharging
immediately, lift bulk loader head. The level meter may be out of order and need to be
overhauled if the material silo is found to be full.
5. If material overflow happens during loading, stop loading immediately. Do not lift bulk
loader head when it is full of materials until the filter tube is demounted and the material in the
tube is removed.
6. Adjusting the length of wire rope to make sure a flexibility of the discharging pipe.
Powder transportation equipment
Powder transportation equipment is imported as it has the most advanced technology and
function of similar equipments around the world. It applies negative pressure transport
principle to send materials from one location to another through the pipeline. The entire
process is completed in confined state entirely to stop any potential harm and pollution from
dust to the work environment, the surrounding area and operators. It can be applied to the
industries of pharmaceutical, food, chemicals and batteries.

 

 

General Information

The fly ash bulk loader  is applicable to bulk load the cement and the fly ash for power factory and cement factory. The main characteristic is different from the common bulk loading system: the material is separate from the hauling mechanism. It highly improves the running rate and the durability and efficient dust collector. This equipment with the discharge device, the slide Conveyor and the vibrate bucket consists the automatic bulk truck and ship loader. And it is equipped with the automatic control system. All the process is closed which could prevent the fly ash overflowing.

●Main Structure and Work Principle

1. Flexible Bulk Loading

Flexible fly ash bulk loading  consists of transmission support, winch device, gearing, rope-loose mechanism, U-steel base, level gage, dust collector, tremie pipe, dust collecting pipe, bulk head. The material passes the tremie pipe and flow into the stock box by gravity. The dust of the tremie pipe and dust collecting pipe will be blew into the dust-collect bag or the ash box. The tremie pipe and the dust collecting pipe are flexible, which could help the pipes up and down. The bulk head is lifting by the winch system, safety control device and the rope-loose mechanism.

2. The dry ash bulk loading system is covered with the rubber layer and sealed with the tanker tightly.

3. The down head adopts the bipyramid structure and the tremie window will close automatically after lifting up.

4. The level gage is equipped with the original packing imported solid tuning fork which has the good quality, sensitive, accuracy and reliable.

 

bulk loader raw material cement bulk loader unloader 1bulk loader raw material cement bulk loader unloader 2bulk loader raw material cement bulk loader unloader 3bulk loader raw material cement bulk loader unloader 4bulk loader raw material cement bulk loader unloader 5

Member Information

Nantong Superior Import and Export Co., Ltd.
Country/Region:Jiang Su - China
Business Nature:Trading Company
Phone:15250669769
Contact:Sherry (Manager)
Last Online:11 Jul, 2015

Related Products of this Company