Model: | WST 30/10-6X5 |
---|---|
Brand: | JUDA |
Origin: | Made In China |
Category: | Electronics & Electricity / Other Electrical & Electronic |
Label: | tap changer |
Price: |
US $14
/ pc
|
Min. Order: | 300 pc |
~
Basic Info
Model NO.: WST 30/20-6X5
Current: 30A
Voltage: 20kv
Export Markets: Global
Product Description
Detailed Description
.contact pressure: ≤350μΩ Tapping heads:: 5
Rated current:: 30A Number of phase: 3
Regulating position:: Central Max. Voltage: 20KV
Tapping positions: 3 Rated voltage:: 20KV
Max. Current: 30A Rated power 50,60HZ
2.This instruction is suitable for strip-type off-circuit tap changer with its frequency of 50, 60Hz,rated current 63A and below ,and rated voltage 33kv (Called tap changer below ).This tap changer is used in the oil-immersed power transformer ,and being operated under off-circuit
~3.Using condition
3.1 The tap changer should be working within the ambient temperature specified as table1:
Table 1
Dielectric medium Temperature ℃
lowest temperature highest temperature
Air ﹣25 40
Oil ﹣25 100
3.2 There should be no explosive and corrosive air around installation place 。
4、Surface dimension and installation dimension of the tap changer (See Figure 1 and table 2).
Figure1
Table2
Remark:
We can customize according to customer requirements specifications of different models below:
H=50mm,H=100mm,H=120mm,H=150mm,H=170mm,H=200mm,H=220mm.
Φd1=2mm, Φd1=2.5mm, Φd1=2.8mm, Φd1=4mm
5. Installation
5.1 Before we install a tap changer, please check each part of the tap changer if they are all right , then the tap changer must be taken dry treatment . The operating method is the same as the method of winding 。
5.2 Double sealing type is adopted between the tap changer and the tank cover :That is a sealing washer is put on the lower part of the tank cover ,and another is put on the upper part of the tank cove
5.3 When installation of switch, please open the switch cover, press the spring gasket ,rotate 90°and pull out the gasket. Then dismantle the hand shank and fixed plate ,pull out the screw nut ,and take out the seal gasket, push out the switch from the tank bottom and put the other seal gasket and pressing ring on the bottom of tank .Then reinstall all the spares above mentioned back.
·Note : After installation,the indicator of tap position should fit for the actual tap position of the switch .
6、Operation
The tap changer can be operated when the power transformer is under off-circuit state 。
When you operate the tap changer ,please lift up the handle shaft ,make the locating block on the locating shaft get away from the locating trough on the locating tray, turn round the handle shaft to the needed position then put the locating block on the locating shaft to the relevant locating trough .
7、Notice item
If the tap changer has oil leakage phenomenon ,you must check the leakage position first ,if the leakage is from the turning axle ,please screw up the plug on the axle ,if the leakage is from the tank cover ,you should screw up the solid nut on the flange .
Yueqing City Hurricane Electric Appliances | |
---|---|
Country/Region: | Zhe Jiang - China |
Business Nature: | Manufacturer |
Phone: | 13736373078 |
Contact: | liu ( manager) |
Last Online: | 09 Aug, 2015 |