Color Steel Sheet Circular Gutter Forming Machine.
1.processing
decoiler--levelling--feeding--punching--roll forming--cutting--out table
2.the main equipment.
decoiler,hydraulic punching machine,hydraulic system,cutting system,electric system,product stand
S. N |
equipment name |
Quantity |
Weight |
1 |
hydraulic decoiler |
1 set |
5T |
2 |
leveling machine |
1 set |
2T |
3 |
servo feeding device |
1 set |
1T |
4 |
punching machine |
1 set |
31T |
5 |
main roll forming machine |
1 set |
28T |
6 |
hydraulic cutting machine |
1 set |
1.5T |
7 |
control system |
1 set |
0.1T |
8 |
out tables |
2 units |
1T |
9 |
spare part |
1 package |
0.1T |
3.the technical parameters
1).decoiler
1.1the inner diameter of coiling:508mm
1.2the range of expanding:480mm-520mm
1.3max width of coiling:1300mm
max weight of coiling:5000kg
2).profile thickness:0.8-1.5mm
3).main forming machine
3.1the material of shaft:45# steel,bearing steel outer diameter 85mm
3.2main motor power:11kw
3.3forming speed:6-12m/min
3.4voltage:380v,50hz,3phase
3.5roller stations:16-25steps
4)cutting system
4.1hydraulic cutting
4.2blade and mould material:CR12 steel with quenched treated 60-62°
1. Delivery: According to customers' requirement
2. Package: Export standard package for container
3. Payment: TT (30% by TT in advance, 70% by TT after you inspect machine we need)
4. Delivery date: Within 30 working days after receiving deposit
5. Products Warranty: 12 month, and we will provide the technical support for whole life of the
4.3cutting system advanced hydraulic drive,after automatic cutting after forming.
5)control system
5.1PLC
5.2coder
6)hydraulic system
Power:3kw
Terms:
1. Delivery: According to customers' requirement
2. Package: Export standard package for container
3. Payment: TT (30% by TT in advance, 70% by TT after you inspect machine we need)
4. Delivery date: Within 30 working days after receiving deposit
5. Products Warranty: 12 month, and we will provide the technical support for whole life of the equipment.