roof asphalt shingles

roof asphalt shingles
Model:single layer
Brand:BFS
Origin:Made In China
Category:Construction & Decoration / Brick & Tile / Bricks Tiles
Label:roof asphalt shingle , asphalt shingle , roof shingle
Price: US $4 / sqm
Min. Order:500 sqm
Inquire Now

Product Description

 

story 20year

 

product photos 

750.jpg

 

specification

 

Product  Specifications

Mode

3-tab asphalt shingle

Length

1000mm±3mm

Width

333mm±3mm

Thickness

2.6mm-2.8mm

Weight per bundle

26kg±0.5kg

structure.jpg.jpg

product features.jpg

 

Wide-Ranging Choice of Color and Exterior

 

For All Climates and Strong Adaptability

 

A Wide Range of Application

 

New Construction Style

 

Non-Special Fittings,Lower Project Cost

 

Heat Insulation and Absorbing Noise

 

Fireproofing and Wind Resistance

 

Light Weight and Environmental Conservation Roof System

 

Work Correctly and Do Not Need Mend

Strong weathering grade guarantees that Glass-Fiber-Tile needn't to be mended when they are made and when doing the finished product's protection.

Never Fade and Instill Firmly:

As the time passing,the color is always new.Basalt is a kind of firm material,neither absorb water nor go bad.Ensuring the eternity of the color,we take the method of ceramics in sharp hot to dye the granule.

Keep Clean by Itself:

Because of preventing static process,the ceramic granules will not absorb dust,never leave stain.Avoiding forming new weed and moss after long-time dust accumulation.

 

 

application

 

packing

 

Shipping:

1.DHL/Fedex/TNT/UPS for samples,Door to Door

2.By sea for large goods or FCL

3.Delivery time:3-7 days for sample,7-20 days for large goods

 

Payment :TT in advance,LC at sight,Western Union  Moneycram Paypl 50% deposit,50% balance before delivery

                      

why choose us

 

company profile

certification

FAQ

 

We have organized several common questions for our clients,may help you sincerely: 

Q1. Are you Factory? 

A: Yes, We are the biggest Asphalt Shingle manufacturer in Northern China.

Q2. Can I have a FREE sample to check your quality?

A: Yes, we can provide free sample to you to let you check our products quality, but need to bear the express charge by yourself. Mixed samples are acceptable.

Q3. What about the lead time?

A: Free Sample needs 1-2 working days; mass production time needs 5-10 working days for order more than one 20"container.

Q4. Do you have any MOQ limit for Asphalt Shingle order?

A: MOQ,:350 Square Meter. 

Q5. How do you ship the goods and how long does it take to arrive?

A: We usually ship by liner ship,  In the purchase of product within 5 working days, We will finish the production and deliver the cargoes to Sea Port as soon as possible. The exact time of receiving is related to the state  and position of customers. Commonly 7 to 10 working days all products can be deliver to the China Port

Q6. What's your payment tems?

A: We accept TT in advance and LC at sight payment. 

Q7. Is it OK to print my logo on Package?

A: Yes. We accept OEM. Please inform us formally before our production and confirm the design firstly based on your own design. The Printing Plate Charge of Each color is USD$250. 

Q8: Do you offer guarantee for your Asphalt Shingle?

A: Yes, we offer limited warranty to our products: 

  Double layer: 30years

  Single Layer: 20years

Q9: How to deal with the faulty? 

A: Firstly, Our products are produced in strict quality control system and the defective rate will be less than 0.2%.
Secondly, during the guarantee period, we will send new products with new order for small quantity. For  defective batch products, we will make a discount on it or we can discuss the solution including re-call  according to real situation.

 

contact tony

 

 

 

Payment Terms:TT/LC
roof asphalt shingles 1roof asphalt shingles 2roof asphalt shingles 3roof asphalt shingles 4

Member Information

Tianjin BFS Building Material Technology Co., Ltd
Country/Region:Tian Jin - China
Business Nature:Manufacturer
Phone:13752318418
Contact:Tony Lee (sales director)
Last Online:22 Nov, 2017