* Want to Know the trends of fish or shrimp farming?
Recent years,shrimp or fish farming is so extensive and intensive that it requires industrially
prepared shrimp feeds, fertilizing the ponds to stimulate the growth of organisms, aeration
to prevent oxygen depletion and regular tidal water exchange. (in some cases close to 300
000 shrimps per hectare)
In this situation,geomembranes have been used in some of the largest shrimp and fish pond
projects in the world.
** Want to know what you can save from fish or shrimp pond liner?
*30% longer service time-Durable and robust
*20% repairing cost-Prevents weeds, grasses, mud and other obstructive contaminants from
entering the pond.
-Reduce the suitability of the environment for bacteria thereby reducing
the need for antibiotics.
*10% installtion and clearance cost-Allow for easy detection and rapid removal of sediment
and waste products.
*** Want to know what project we ever done?
Aquaculture
Landfill
**** Want to know how we produce it?
***** Want to know how it is installed?
1.1 GEOMEMBRANE DELIVERY, HANDLING, STORAGE
-Geomembrane each panel is marked with panel size and number
-Delivered directly to an accessible site and unloading with forklift under QA Representative
-Stored in a dry area, as close to the work area as possible.
1.2 FIELD INSTALLATION PROCEDURES
1.2.1 PANEL PLACEMENT.
-Install field panels according to the layout drawing and record the date, time, panel number and dimensions ,submitted
to the Third Party QA Representative.
1.2.2 GEOMEMBRANE FIELD SEAMING
- Layout. Seams shall be oriented parallel to the slope; Each seam shall indicate seam number, welder ID, machine number,
temperature setting, and weather conditions
- Trial Welds. The trail weld shall be conducted by welding Technicians. By joining two pieces of geomembrane at least 15
cm in width. Trial welds for fusion welds will be 3-4 mt. long and extrusion weld trial seams will be a minimum of 1 mt long.
- Formal Fusion Weldingand Extrusion Fillet Welding
1.3 - CONSTRUCTION QUALITY CONTROL
1.3.1 Test Method:Non-destructive test and destructive test.
1.3.2 Welding Test:Peel testing and shear testing
The Best Project Material Co.,Ltd | |
---|---|
Country/Region: | Shan Dong - China |
Business Nature: | Trading Company |
Phone: | 13210611235 |
Contact: | Angelia Du (Sales person) |
Last Online: | 11 Jun, 2018 |