Model: | M-V |
---|---|
Brand: | Chenghong ALL BOATS |
Origin: | Made In China |
Category: | Chemicals / Coatings, Varnish & Painting |
Label: | varnishpaintcoating , clear coat , mirror varnish |
Price: |
US $5
/ pc
|
Min. Order: | 100 pc |
ALL BOATS Car Paint Varnish Spray Paint for Car Refinish or Repair Medium High Strength Varnish Mirror Varnish 2K Profil Clear Xpress Clear Coat
Characteristic: High Solid 2K Varnish, suitable for overall refinishing and panel or spot repairs with special high gloss, it could resist all kinds of chemical attacks, possesses excellent gloss and color retention.
Substrate: ChengHong series of 1K primer
Surface Cleaning: Wipe the dust spots and silver particles on the surface with a dusting cloth.
Mixing ratio(Volume ratio):
Name |
Varnish |
Hardener |
Thinner |
|
2 |
1 |
0.2-0.5 |
<18°C |
Varnish |
Quick Drying |
Quick Drying |
18°C-24°C |
Varnish |
Standard Drying |
Standard Drying |
25°C-30°C |
Varnish |
Slow Drying |
Slow Drying |
>30°C |
Varnish |
Ultra Slow Drying |
Ultra Slow Drying |
Usable Time: 25°C Quick Drying: 2hrs
25°C Standard Drying & Slow Drying:4hrs
Paint Spraying Caliber: Gravity Type(Upper kettle): 1.2-1.4mm
Siphon Type(lower kettle): 1.3-1.5mm
Paint Spraying Pressure(Mpa): 2.0-4.0
Spray Layers: 2-3 layers, 40-60um total thickness
Flash Time: 5-10mins, 25°C (It needs stand after spraying.)
Standing Time: Heating and baking after 15-20 minutes
Drying Time:
Temperature |
Dust Free time |
Touch Time |
Assembly time |
Burnishing time |
25°C |
30mins |
2hrs |
7hrs |
14hrs |
60°C |
5mins |
15mins |
30mins |
45mins |
Shelf Life: 2 years if stored in Original sealed containers at 20°C
NOTE:
1. In winter,when the temperature is less than 15 degree, do not dry the paint file in the air, the most way is to bake them in spray booth with 60 degree inside.
2. When the temperature is higher than 30°C, the appropriate amount of Butyl Cellosolve should be added when the thinner is used. For details of Butyl Cellosolve, please refer to the application instruction of Butyl Cellosolve.
3. If there is any cratering in the spraying process, please stop the construction immediately and add 0.5%-1% Anti-cratering water to the remaining paint and then spray.
4. Spray fade-out thinner directly on the connecting area between new and old paint film so as to achieve invisible transition. For details of fade-out thinner, please refer to the application instruction of Fade-out thinner.
5. Clear coat mixed with hardener must be exhausted asap. Do not keep it to continue to use it.
6. Please clean all spray tools with Thinner Immediately after use, otherwise it will be difficult to remove.
7. If there are seedy and sags after spraying, it can be sanded by sand paper(1200#-2000#) and burnished after being fully cured.
Guanzhou Cheng Hong Articles Company | |
---|---|
Country/Region: | Guang Dong - China |
Business Nature: | Manufacturer |
Phone: | 15707495581 |
Contact: | Catherin (Sales Manager) |
Last Online: | 27 Aug, 2018 |