Model: | MPES-01 |
---|---|
Brand: | Moengstar |
Origin: | Made In China |
Category: | Chemicals / Plastic Materials |
Label: | Recycled plastic , black masterbatch , PE resins |
Price: |
US $1
/ kg
|
Min. Order: | 3000 kg |
Basic information
MPES-01 is excellent performance of high and low temperature and excellent mechanical properties, it can effectively meet the production and application of optical fiber cable.
Properties |
Typical Value |
Test Method |
Appearance |
Black granule |
Visual |
Density /(g/cm3) |
0.94-0.955 |
GB/T 1033.1-2008 |
Melt index /(g/10min,@190℃、2.16kg) |
0.7±0.3 |
GB/T 3682-2000 |
Tensile strength /(MPa) |
≥17 |
GB/T 1040.3-2006 |
Tensile yield strength/(MPa) |
≥12 |
GB/T 1040.3-2006 |
Elongation at break /% |
≥600 |
GB/T 1040.3-2006 |
200℃ oxidation induction period /min |
≥30 |
GB/T 2951.42-2008 |
Carbon black content /% |
2.6±0.25 |
GB/T 2951.41-2008 |
Carbon black dispersion |
2 |
GB/T18251-2000 |
Oven heat aging Tensile strength/MPa Elongation at break/% |
≥16 ≥500 |
GB/T 2951.12-2008 |
Environmental stress cracking F0/h |
≥500 |
GB/T 2951.12-2008 |
Dielectric strength Ed/(kV/mm) |
≥25 |
GB/T 1408.1-2006 |
Volume resistivity ρv/Ω.m |
≥1*1014 |
GB/T 1410-2006 |
Dielectric constant(50Hz) |
≤2.8 |
GB/T 1409-2006 |
Application
MPES-01 is a black polyethylene granule with high molecular weight, linear and medium density, mainly used to make PE outer sheath material for optical fiber cable.
Manufacturability
MPES-01 this product can use ordinary PE extrusion molding machine, screw length to diameter ratio L/D More than or equal to 20, take φ60 machine as an example, this screen printing plate s estion placed three layers of filter screen for 80 mesh / 120 mesh, 80 mesh, the melt temperature advice below 200 ℃, It is best to make the surface smooth and without stomata.
F . A .Q
1)What is your sample policy
We can supply the sample if we have ready parts in stock, but the customers have to pay the courier cost
2)What is your terms of packing
Generally, we pack our goods by brown cartons.
3)How about your delivery time
Generally,It will take 30 days to 60 days after receiving your advance payment.The specific delivery time depends on the items and the quantity of your order
4)How about the ogistics information
we have some cooperative logistics companies in China, such as DHL, UPS, FEDEX, TNT ect. Goods can be shipped by sea or air but the prices are different. If customer specifies other logistics, we will be shipped by it
Our service
1、Provide solutions and high quality products If a customer finds an equivalent product at a lower price, inform us and we will do our best to match or lower that price
2、Provide complete post-sale service, including installation
3、Please contact us at any time.If you have any questions, we will be the first time for you to answer
In a word,We sincerely invite you to the mutually beneficial cooperation, We respect every custome and we sincerely do business and make friends with them, no matter where they come from.
Payment Terms: | TT/TC/Western Union |
---|---|
Shenzhen Moengstar Energy & Material Technology Co., Ltd | |
---|---|
Country/Region: | Guang Dong - China |
Business Nature: | Manufacturer |
Phone: | 15766200990 |
Contact: | Mirror Wang (Saleman) |
Last Online: | 26 Dec, 2019 |