Model: | 09 |
---|---|
Brand: | DCI |
Origin: | Made In China |
Category: | Construction & Decoration / Other Construction Materials |
Label: | Gypsum Stucco Machin , Gypsum Stucco Machin , Gypsum Stucco Plant |
Price: |
US $300000
/ pc
|
Min. Order: | 1 pc |
Controlling Part |
Full Automatic / Semi-Automatic |
Annual capacity |
Customized (20, 000-300, 000 Tons Per Year) |
Calcining system |
Ebullition furnace |
Rotary kiln |
|
Fuel |
Natural gas, diesel, coal, heavy oil |
Raw material |
Natural Gypsum Rock (Content of CaSO4@2H2O >80%.)
|
Finished powder usage |
Gypsum board |
Plaster powder |
|
Setting time |
The Initial Setting Time: Shall Not Be Less Than 6 Minutes,
|
1. Gypsum powder quality standard: in compliance with GB/T 9776-2008
2. Main Technology(here take Nature gypsum rock as example)
Gypsum rock - first crushing -second crushing - grinding - calcining - aging -finished products (CaSO4.1/2H2O)
After being heated and calcined with certain temperature,natural dihydrate gypsum is dehydrated and decompounded,to get the product whose major component is semi-hydrated gypsum(CaSO4.1/2H2O),that is,calained gypsum(generally slaked gypsum).According to different temperatures and pressure conditions during dehydration decomposition,the obtained product is β-Type calcined gypsum.Basic process of mechanized prouduction includes five large systems:gypsum grinding,automatic measuring system,calcination system,heat supply system,and aging&packing system.According to client's requirement,gypsum crushing system can be added to crush large gypsum rock to be with size of 0-30mm,and then conveyed into grinding system.
3.Payment conditions:
A. Payment terms: 30% T/T in advance; 70%L/C or T/T
B. We can provide quality guarantee;
C. Kunlun bank account available to make convenient for Iranian client
National Standard of Calcined Gypsum
Standard No.: GB/T 9776-2008
Scope of application:
Gelled material made by dehydrating natural gypsum(raw material). Its main component isβ-GaSO4·1/2H2O, without any admixture or additive.
The natural gypsum should be in conformity with requirements of "gypsum rock(JC/T700) for making cementing material" gypsum rock of Grade 3 or more higher grades.
Classification:
It is classified to be three grades: 3.0,2.0,and 1.6 according to its 2h strength(breaking strength).
Composition:
β-GaSO4·1/2H2O content(mass fraction) in Calcined gypsum should be not less than 60.0%.
Physical and chemical performance:
Grade |
Fineness(Screen residue of 0.2mm square screen)/% |
Setting time |
2h strength/MPa |
||
First setting |
Final setting |
Breaking strength |
Compression strength |
||
3.0 |
≤10 |
≥3 |
≤30 |
≥3.0 |
≥6.0 |
2.0 |
≥2.0 |
≥4.0 |
|||
1.6 |
≥1.6 |
≥3.0 |
Note: 1Mpa=10.2kgf/cm2
Responsibility of Buyer and Seller
Prepared by Buyer
1.1 Machinery and tools for installation, commission and maintenance
1.2 Transportation tool:2 sets of forklifts
1.3 Power supply system
a. High-voltage power supply
b. Substation and distribution station
1.4. Water supply& storage and drainage system
1.5 Civil engineering: Building construction, equipment foundation(including pre-burying work), steel-concrete structure silos and pools.
1.6 Material used for making machine's platform and supporting frame of equipment
Provided by Buyer
2.1 Providing round-trip ticket and other transportation cost for the Seller's workers
2.2 Providing accommodation and all kinds of necessary extra charges for the Seller's workers during installation and commissioning and training period
2.3 Providing all necessary large tools for installation, such as crane, forklift, welder, acetylene& oxygen cutting machine, etc
2.4 Providing assistant workers to cooperate with the Seller's workers during installing according to the Seller's requirement
2.5 Usage permission for special equipment
Provided by Seller
2.1 Production equipment
2.2 Gypsum Board Production Line,
Providing installation guiding engineers and technical workers
2.3 Providing 1 team leaders and 1 interpreters
2.4 Providing equipment foundation drawings, general arrangement drawing of production line (layout plan, elevation drawing and side view drawing) within 40 days after receiving down payment
2.5 Providing equipments' operation manual during training
2.6 Providing main equipments' general assembly drawing, wiring diagram of control cabinets, PLC computer programs within 7 days after acceptance
2.7 The Seller is in charge of commissioning and training
a. Commissioning: the Seller shall send engineers and technical workers to plant site to do full-scale testing, and the Buyer shall also send assistant staff to cooperate with the Seller's people.
b. The Seller's workers in charge of commissioning will do performance operation, make on-site speeches and answer questions to Buyer's technicians and operation workers under training. During the whole process of testing, both sides shall work together. After Buyer's workers master operation technique, the Seller will hand over the whole running line to the Buyer's for operation and then the training work is finished.
2.8 Within one year after signing the Acceptance Certificate, the Seller shall provide technical consultation to the Buyer for free. If the Seller's people are asked to be on the site, the Buyer shall provide round-way tickets and accommodation abroad.
Environmental protection:
Main pollution sources:
Waste residue: Waste board and board edge cut down, etc.
Waste water: The sediment water left after the fan circulation use in the product process, from washing pool and toilet water.
Noise: mainly is 95Db(A)or so noise from the fan.
Dust: From mixing material and cutting board.
Disposal methods:
Waste residue and disposal: It does not pollute the environment and can be re-used afterreprocessing in gypsum powder production line.
Waste water and disposal: No industrial waste water. The living wastewater is drained into the plant sewage network, and the production wastewater from cleaning floor in the workshops can be recycled after the secondary sedimentation. And the water used in such equipment as fan can also be recycled.
Noise and deposition: Noise, which mainly comes from fan. Besides setting soft joints at the exhaust inlet and exhaust outlet. Set impedance complex mufflers at the exhaust outlet, which can low the noise as much as 30Db (A).
Dust and disposal: Dust collection devices will be equipped in the production process.
Labor sanitation
Safety design
Safety design for factory area
The factory road traffic design and outdoor fire hydrant arrangement will be in conformity with every requirement in "Achitectural Design Fire Prevention Norm"; The pavements and driveways are smooth, unblocked, and there are enough lighting facilities at night; Set covers over the draniage ditches in the factory; Make it easy to go through, discharge, convenient and safe; at the same time do virescence in the whole factory to reduce the dust and noises.
Safety design for workshop
In the workshop, certain safe distance must be left for the main passages and operating passages, between equipments and the building, between equipment and equipment, and between equipment and passages; Set guard rail on all workbench edges; Set covers over drainage ditches; Lighting is enough in the workshop; All electrical equipments have ground protection, and there is overhauling power of 36V to ensure of overhaul safety.
Harmful factor in producing:
Variety of harmful substance: Noises from fan, air compressor, etc.
Measures to reduce harmful factors: Do best to select low noise equipments to reduce the noise from sound source, and meanwhile add anti-vibration soft connectioner and muffler on the fan.
Precautionary measures of safety and sanitation
Protective appliances shall be allotted to each worker according to real working conditions; All equipment is managed by certain person, the detailed operational procedure shall be made. Workers on duty must carry on safety education and corresponding skills training; strictly operate according to operation procedure to ensure the person's security and equipment's good condition; Regularly carry on safety education to staff; Regularly organize safety inspecton to dispel the accident potential in time.
Explosionproof
Explosive materials are not produced and discharged in the production workshop of this project. There is no factor of explosion.
Fire fighting system
Our equipment is not easy to produce fireworks, so don't need any corresponding fire detection device.
After Sale Service
DCI is pleased to provide the parts,knowledge and expertise to assist with all your plant's maintenance and upgrade needs.We can supply as below:
Spare Parts:
All Rollers and Shafts
Mixer Parts
Forming Plate Parts
Saw Blades
Forming Belts/Conveyor Belting
Carbon Bearings
Dryer Sprockets
Chain
Chain Guides
Head/Tail Pulleys
Plat Belt Drive Pulleys
Filter Bags
Raw Material
Modified Starch
Paper
Foaming Agent
Glue
Edge Tape
Fiberglass
White Tape
Technical Support
DCI's guarantee is within 1 year free after delivery and long-term service
DCI can help u to modify equipment and increase production capacity
DCI can help u solve any problems related to the gypsum equipment
DCI,the gypsum machinery expert,your best choice!
HENGSHUI DECHENG MACHINERY & EQUIPMENT CO.,LTD | |
---|---|
Country/Region: | He Bei - China |
Business Nature: | Manufacturer |
Phone: | 13931129026 |
Contact: | Anjing (manager) |
Last Online: | 10 Dec, 2019 |