304 stainless steel flexible waterproof casing

304 stainless steel flexible waterproof casing
Model:DN25-DN2000
Brand:Zhongtai Pipeline 13526557222
Origin:Made In China
Category:Construction & Decoration / Pipe, Tube & Parts / Pipe Fittings
Label:Waterproof casing , Flexible waterproof , 304 stainless steel
Price: ¥588 / pc
Min. Order:1 pc
Inquire Now

Product Description

Because there are many product specifications and models, it is a customized product, according to the specific specifications of the required product

No. offer.

 

Detailed introduction of stainless steel waterproof casing:

Stainless steel waterproof casing is generally suitable for structures subject to vibration or strict waterproof requirements where the pipe passes through the wall; the wall where the pipe passes through the wall should be replaced with a concrete wall if it is not concrete, and flexible waterproof casing must be used Once solidified in the wall; stainless steel waterproof casing is used in construction, chemical, steel, tap water, sewage treatment and other units.

  When pipelines pass through foundations, inner walls, floor slabs, etc., avoid the use of pipelines (pressured pipelines, such as water supply, heating, etc.) to cause disturbance to the building. At the same time, the flexible waterproof casing facilitates the installation and maintenance of the pipeline. , Short pipes that are larger than the outer diameter of the installation pipe, whose material and length meet the requirements, are installed on the foundation, inner walls, floor slabs and other pipe crossings.

Stainless steel waterproof casing is mostly made of welded pipes, and both ends should be mechanically cut (for example, with a toothless saw, etc.), and the wall thickness is not strict. "Waterproof casing" Specially made casing is installed when the pipeline passes through the basement and other buildings and structures with waterproof requirements. Rigid waterproof casing is commonly used.

Rigid waterproof casing, the water-stop ring wing needs to be welded outside the casing. There are strict requirements on the wall thickness of the casing and the wall thickness of the ring wing, and the quality of the welding seam should be guaranteed.

When the pipeline passes through the concrete structure of the shear wall foundation, through the beam, and through the special-shaped column, it should be installed together with the civil construction. The reason is that after the holes are reserved, the secondary pouring between the casing and the concrete is not easy to handle; some cannot be handled, such as installing rigid waterproof casings on the concrete shear wall of the basement foundation.

means that when pipes pass through concrete floor slabs or ordinary brick walls, holes are generally reserved in the concrete floor slabs, and ordinary brick walls can be drilled through the wall holes. At the floor, before installing the pipeline, disconnect the wire and install the casing. On the brick wall, draw lines, plant brackets, find the slope, and install the casing.

304 stainless steel flexible waterproof casing 1304 stainless steel flexible waterproof casing 2304 stainless steel flexible waterproof casing 3304 stainless steel flexible waterproof casing 4304 stainless steel flexible waterproof casing 5

Member Information

Zhengzhou Zhongtai Pipeline Equipment Manufacturing Co., Ltd.
Country/Region:He Nan - China
Business Nature:Manufacturer
Phone:13526557222
Contact:Ms. Zhao (sales)
Last Online:01 Apr, 2021

Related Products of this Company