Double plug inflatable packer for curtain consolidation grouting

Double plug inflatable packer for curtain consolidation grouting
Model:40-200mm
Brand:BIAOHUI
Origin:Made In China
Category:Industrial Supplies / Other Industrial Supplies
Label:Grouting hole se , Inflatable packe , Water injection pack
Price: -
Min. Order:1 pc
Inquire Now

Product Description

1、 Product introduction

Use 1. Coal body water injection, dust reduction, coal pressure reduction, coal splitting, gas discharge, etc. 2. Grouting, water injection and hole pl ing of coal or rock mass. 3. It is used for curtain, consolidation, backfilling, chemical grouting and cement grouting of hydropower stations and reservoirs. 4. Water pressure test for geological exploration and water pl ing for drilling.

2、 Using

1. Connect all pipeline systems, tighten all screw threads, connect the air source (or hydraulic pump), place the grouting plug at the orifice (or in a closed steel pipe at one end) for pressure test, check whether the joint leaks, and put it into the hole for standby.

2. Open the pressure reducing valve of the gas cylinder or the water pressure pump to allow the grouting plug to expand slowly. Note that the inflation pressure must be greater than 2/3 of the grouting pressure. Grouting can be started when the predetermined pressure is reached.

3. At the beginning of grouting, when there is a large amount of grout coming out of the grout return port, slowly pressurize it to the predetermined grouting pressure by several times, otherwise it is easy to form a large differential pressure. During grouting, the pressure on the pressure gauge of the pressure reducing valve of the gas cylinder shall be checked frequently. If it is reduced, it shall be supplemented immediately.

4. When the grouting time is long, it is necessary to check whether there is grout channeling, blocking and returning. If there is, stop grouting, release the pressure, and loosen the air plug up and down to prevent it from being consolidated and difficult to take out.

5. At the end of grouting, the grouting pressure must be released first, and then the inflation pressure must be released. Do not release the inflation pressure first to prevent the grouting plug from shooting out and causing safety accidents.

6. After grouting, just put the grouting plug into the closed steel pipe at one end, inflate about 0.5Mpa, and then conduct cyclic flushing.

7. After the grout plug is taken out, connect the water pipe with the grout inlet pipe and the grout return pipe for flushing.

8. When multiple holes are grouted together, all pipelines must be arranged in parallel and shall not be twisted together to prevent accidents in one hole from affecting the safety of other holes.

9. After a long time of use, the lower end of the grouting plug shall be disassembled for cleaning and greased.

10. When long cracks or relatively broken are found during drilling, grout channeling, pl ing and grout return may occur, and another air pipe shall be put to the upper end of the grouting plug. If grout channeling, pl ing and grout return occur, high pressure air shall be used to flush it to prevent jamming.

3、 Main technical parameters:

Sealing hole diameter 30-2000mm (can be processed according to user requirements)

Working pressure 1-8MPa (can be processed according to user requirements)

Working flow: 3-4.5 tons per hour

Hole sealing depth 1-8000m

SIZE I.D(mm) O.D(mm) Expansion Range(mm) Aperture(mm) W.P(Mpa) T.P(Mpa) B.P(Mpa)
φ16-2 16±0.5 30±1.5 50  +8/-2 40 8 16 32
φ16-4 16±0.5 36±1.5 50  +8/-2 40 20 30 40
φ19-2 19±0.5 36±1.5 60  +8/-2 45 8 16 32
φ19-4 19±0.5 40±2.0 60  +8/-2 45 20 30 40
Φ22-2 22±0.5 39±2.0 80  +8/-4 50 6 12 24
Φ22-4 22±0.5 45±2.0 80  +8/-4 50 20 30 40
Φ25-2 25±0.5 42±2.0 90  +8/-4 65 6 12 24
Φ25-4 25±0.5 48±2.0 85  +8/-4 55 16 24 32
Φ32-2 32±0.5 50±2.0 90  +8/-4 60 6 12 24
Φ32-4 32±0.5 54±2.0 90  +8/-4 60 16 24 32
Φ38-2 38±0.5 55±2.0 95  +8/-4 65 5 10 20
Φ38-4 38±0.5 60±2.0 95  +8/-4 65 16 24 32
Φ45-2 45±0.5 63±2.0 100  +8/-4 75 4 8 16
Φ45-4 45±0.5 69±2.0 100  +8/-4 75 16 24 32
Φ51-2 51±0.5 69±2.0 110  +8/-4 90 4 8 16
Φ51-4 51±0.5 75±2.0 110  +8/-4 90 16 24 32
Φ64-2 64±0.5 84±2.0 120  +8/-4 100 3 6 12
Φ64-4 64±0.5 90±2.0 120  +8/-4 100 8 12 16
Φ76-2 76±0.5 94±2.0 130  +8/-5 110 3 6 12
Φ76-4 76±0.5 99±2.0 130  +8/-5 110 8 12 16
Φ89-2 89±0.5 109±2.0 140  +8/-5 130 3 6 12
Φ102-2 102±0.5 122±2.0 160  +8/-5 150 3 6 12
Double plug inflatable packer for curtain consolidation grouting 1Double plug inflatable packer for curtain consolidation grouting 2Double plug inflatable packer for curtain consolidation grouting 3Double plug inflatable packer for curtain consolidation grouting 4Double plug inflatable packer for curtain consolidation grouting 5

Member Information

Country/Region:He Bei - China
Business Nature:Manufacturer
Phone:15075803959
Contact:
Last Online:09 Jan, 2023