F-512 high-pressure filling machine

F-512 high-pressure filling machine
Model:F-512
Brand:SAKING
Origin:Made In Taiwan, China
Category:Construction & Decoration / Waterproof Materials
Label:High-pressure fillin , Sealing needle , Pl ing electric pu
Price: ¥3000 / pc
Min. Order:1 pc
Inquire Now

Product Description

Business Qin Industrial Co., Ltd. Taiwan
saking F512 high pressure pouring machine operators handling the Taiwan Industrial Co., Ltd. manufacturing, chemical grouting is pl ing buildings and structures, structural reinforcement of the professional construction equipment.
1. Working pressure: the instantaneous pressure up 10000Psi )(construction of the maximum working pressure of 500 kg, is strictly prohibited more than 700 kg) flux of 0.74 liters / minute, can more than chemical pulp hairline cracks deep into the 0.02mm up to 1000mm.
2. Mechanical performance and stability: a point of order by the operation, use matching grouting mouth, can be guaranteed., Continuous, efficient and safe construction.
3. Easy to use: small size, light weight, easy handling, cleaning and maintenance, as long as you can use 220V power connection.
4. For infusion materials: water-soluble polyurethane pl ing agent, oil-soluble polyurethane sealing agent, epoxy resin infusion material, acrylic resin infusion materials and other non granular, low viscosity slurry.
Note: When using the two-component liquid filling, filling material before curing time to master, to prevent the grout curing in the machine, not the filling parts will be scrapped because they could not wash.
5, a machine: pl ing grouting, consolidation grouting soft ground, dry cracks in the reinforced structure grouting.
III. Motor power: 560W, single-phase AC 220V/50Hz.
IV. Instructions for use:
(A) Use Code:
1. Correct electrical connection: the machine need to use 220V AC, 380V AC can not be used.
2. Maintain normal components:
a, be sure to tighten the screws machinery parts, electric drills must be fully inserted within the holder shall not be loose.
b, high pressure and high pressure pipe and the main fuselage body perfusion connection with raw materials must be wrapped after tightening, to prevent leakage of slurry.
c, gauge reactions to be normal. Construction, such as lifting Biaozhen not work, after the table is to be replaced with new construction.
3, prohibited items:
a, grouting, is strictly prohibited to click way switching power supply; prohibited in more than 200 kilograms of pressure to start the second case; prohibited under pressure of more than 700 kilograms to grouting.
b, non-perfusion component of the slurry particles, such as resin mortar, cement mortar, non shrink cement.
c, is prohibited without the viscosity of the liquid 9 such as (toluene, acetone, water, wait) test pressure.
Note: The violation of the above prohibitions operation, the gears may cause excessive load on the system components fracture occurs, high pressure pipe burst. The resulting mechanical scrap the consequences, no warranty.
(B) washing machines
Not more than 4 hours continuous grouting to prevent overheating caused by component wear. More than 30 minutes to stop grouting or construction is completed, the machine should be cleaned. Cleaning agents can be used for cleaning
Cleaning Methods: The first set drums and all the high-pressure slurry pump back to the tube container, within the home barrel into the top of the 300cc high-pressure pipe cleaning agent in the slurry. After all of the top of the slurry, then poured into the 300CC cleaning agent, the infusion set into the barrel in the gun cleaning cycle, cleaning detergent for 2-3 minutes after the infusion container, and then into the amount of circulating oil to maintain lubrication, cleaning shall be completed.
(C) Troubleshooting
1, such as pulp machine without pressure or not, first check the high pressure pouring butter gun front head gasket is deformed. If deformed, needs a new gasket (due to work pressure machines, gaskets need to be changed frequently.)
2, butter head gasket if there is no problem, check the pressure gauge pipe and join the following three links have dirt clogging the port, if you can clean up.
3, the front end of the two checks, the machine still no pressure or no pulp, add the three links under the gauge twist, the copper springs and ball bearings to pump out the washing, and cleaning dirt cavity pump . After washing according to the order of tee ball → → Replace the spring can be.
4, join the parts of premises such as tainted slurry, please tape wrapped tightly after use and re-tighten the connection.
5, then set the machine under the barrel at the main spindle and spindle nut piston within the Teflon washers, where the function is leakproof. In case of leakage of plasma, adjust the spindle can stanch.
Fifth, construction technology
(A) of the pre-construction steps
1, looking for cracks: the wet grass roots, first clean out the water until all clean up grass-roots, the surface is slightly dry, carefully look for cracks, leaks and cracks in the sewage cleaning traces of dirt or mold, using colored pens or chalk along the cracks well mark; for primary drying, cleaning air pump or hair dryer can be used after the blowing dust on the surface.
2, drill: According to the thickness of concrete from the cracks of about 150-350mm, cross-drilled on both sides along the crack direction. Pitch should be spot the actual situation, after a two-hole grouting can be fluid in the crack of the principle of convergence, generally appropriate for the beginning of the pitch 200mm; holes and cracks in the grouting section should be supporting the diameter of the mouth, generally adopted as the 14mm drill bit. Holes and cracks in section 45 should be 60 degrees through the cross, and cross in the bottom of the 1 / 3 range.
3, buried grouting mouth: the mouth as the supporting parts grouting is injected into cracks in the grout joints. When laying the rubber part of the drilled hole has been stuffed, and then grouting the mouth at the front of the six-party tools for fastening, and the mouth as much as possible so that the rubber parts and grouting hole wall dry, otherwise easily lead when tightening slipping.
(B) should pay attention to the problems pre-construction
1, looking for cracks, the first cracks in the analysis should, according to the different crack width, length, core, respectively, to find out the law of development of crack depth, a reasonable arrangement position of the hole. If not through the cracks and shallow depth, can not core.
2, looking for cracks is a tedious and meticulous work, such as surface easy to dry, you can use the torch drying, cracks due to moisture, can be found immediately, can improve efficiency. Construction of each block to ensure that no omissions.
(C) perfusion slurry
1, filling the mouth slurry grouting should start the first frame (structure perfusion elevation from bottom to top), when the slurry emerge from the cracks, it should stop, continue into the second cell infusion, and then click to move to. In the infusion process, if the slurry adjacent grouting full mouth location, you can jump without injection; such as grouting and found cracks in both ends of the extension still cracks or cracks with cross holes should fill the position, re-injection pulp. In this way, the whole of the first cracks in the end be considered due to grouting.
2, for the cracks completely filled with grout, grouting should be secondary. The second infusion should be submitted at regular intervals between each time, but must be completed before the slurry solidified. If the second perfusion, yet filled with slurry, the location should be re-drilling grouting.
(D) should pay attention to the problem of grouting
1, when a cell grouting mouth in a long time after the infusion (approximately 5 minutes), not size emitting from the cracks, stop infusion, carried out between the intervals, if not filled, check whether drilling crack cross and floor holes are caused due to run pulp, etc., etc. and then to investigate the cause.
2, the infusion should be closely watched gauge of work perfusion machine, if more than the rated pressure (500 kg). Pressure Gauge should be back down to zero before. If the pressure remains high, should be re-drilling, drilling and fracture and confirmed again when the full cross-grouting.
3, block grouting, such as cracks and holes there is no water until the slurry infusion is completed, from the mouth to the crack of the original grouting water recharge (winter or lower ambient temperature should be above the water recharge 30c).
4, polyurethane sealing agent is a water swelling material, the work should wear suitable protective equipment such as gloves, at a mirror, such as accidentally splashed into the eyes, immediately to the hospital.
(E) surface cleaning and equipment maintenance
1, to be solidified slurry, the construction side in time to clean up cured slurry, clear water does not drain after grouting smooth mouth.
2, continuous machine perfusion using a maximum of 4 hours, such as the halfway stop for more than 30 minutes, should be cleaned machinery, oil filling after cleaning.
Dosing Equipment should be inspected regularly before use (gear box should be regularly filling butter), abnormal, immediate repair to prevent the construction of failure.
 
F-512 high-pressure filling machine 1F-512 high-pressure filling machine 2F-512 high-pressure filling machine 3F-512 high-pressure filling machine 4F-512 high-pressure filling machine 5

Member Information

Taiwan to ground Industrial Co., Ltd.
Country/Region:Guang Dong - China
Business Nature:Manufacturer
Phone:0757-23811155
Contact:Xiao Xiansheng (General Manager)
Last Online:05 Dec, 2011

Related Products of this Company