Automatic fire line

Automatic fire line
Model:LT-GZ-401
Brand:firelethai
Origin:Made In China
Category:Security & Protection / Fire Fighting
Label:Filling fire , Production of fire e , Automatic production
Price: -
Min. Order:-

Product Description

1. Start a boot screen, boot screen control system for the name, and information systems.

2. The main screen to run for a period of time, a pop-up password box, when members plan to enter the correct password, the main pop-up screen.

3. The main screen menu functions are related, the menu is divided into functions: program management, reporting functions, inventory management, product management, information management, systems management, equipment management, production management.

4. Management plans to set up the next: Entry-week program, plans to view the week, Japan plans to input on plans to see, as well as to help the five sub-menu.

5. Entry-week program for entry-week plan, respectively, for each production line, Zhou plans to issue a total of 20 lines, when the plan click on the corresponding member of the production line, automatic pop-up a password box, when members plan to enter the correct password, Automatic pop-up form a separate window, and plan accordingly in the entry-week program window. When the members plan to enter the incorrect password, then prompted a pop-up box that prompts the box showed that states: password wrong! You do not have permission to visit the window.

6. Entry-week window in the plan, plan members only entry, customer name, product assembly drawings, Kanban number weeks, production plans; when members plan to enter the assembly of products, drawings, the system automatically from the form of product management Out in the relevant parts of the product number of drawings week fill in the corresponding plan of the table; when members plan to enter the name of the customer, the system automatically fill in the name of the customer statements to the function of the corresponding statements for preservation; when members plan to enter Kanban number, the system automatically fill in the numbers billboards feature statements to the corresponding statement for preservation; when members plan to enter the second week, the system automatically weeks time to fill out statements of the functions of the corresponding statements for preservation; when members plan to enter Production plans, inventory management system automatically checks in the form of the product parts and components related to the stock, if the scheme members plan to enter the stock is greater than production, the system automatically prompts a pop-up box, s esting that stock Insufficient production, the inventory of my colleagues not to carry out the production of parts and components, and the current inventory; when members plan to enter the second week, the system automatically weeks time to fill out statements of the functions of the corresponding statements for preservation.

7. Week in the implementation of the plan, according to the order in which they have implemented the scheme from day-week program of access to the Japanese plan can be produced in accordance with the need for change, but also need to change the password before they can change.

8. Japan is in accordance with the production lines for the arrangement, the Japanese plan for the implementation of the process: If there are plans to work according to schedule, in accordance with the order in which they plan to transfer the production line inside the PLC in the transmission, computer products from Management in the form of access to the products of various process parameters, as well as the number of plans to transfer production to the PLC in all registers, from production and implementation of the PLC.
9. Zhou plans and Japan is of the view that no restrictions can also view the local area network.
10. Statements of the function is used to check the production line of statements, the statements generated by the PLC for the provision of the production data, when the PLC to complete the implementation of a plan after the computer to complete the implementation of the plan products, diagram, Kanban, customer name , As well as related technical parameters, and the all-time workers get maximum value as the result of the production of beats for storage. Technology-related parameters by the PLC to register the data provided.
11. In the statement of function, all of the production line, as a workshop on the production of summary statements, and then a week of production volume, according to the different number of drawings for summary (Monday 7:00 am to 7:00 am next Monday) summarized as Zhou statements.
12. At 7:00 every day on the statements by way of e-mail sent to the pre-good-mail-mail address above.
13. Attendance through the electronic card (pre-operatives in the need for post card, for example, operatives (a) brush-off cards, in the absence of other credit card operators, all products manufactured for the record, operatives (a) of the Production. Until the other operators to use their credit cards, only the output of the production recorded in the production of other operatives above) operatives attendance card information stored inside the computer, credit cards in the PLC when the corresponding data available to the Host computer and then convert the data into the computer operator to fill in the names of the various statements. 
  14. The various functions statements are printed.
Automatic fire line 1

Member Information

kunshanlethaijidian
Country/Region:Jiang Su - China
Business Nature:Manufacturer
Phone:+86-159956-00027
Contact:Maven Chen (Manager)
Last Online:13 Nov, 2013

Related Products of this Company