Model: | - |
---|---|
Brand: | YI MAO LING |
Origin: | Made In China |
Category: | Construction & Decoration / Shaped Building Material |
Label: | Construction Structu , FRP |
Price: |
-
|
Min. Order: | 10 pc |
Description
High-strength construction structural adhesive is a composite resin adhesive and made up of two components A&B adhesives. The component ration is A:B=20:1. It has such advantages as strong anchoring force, high curing speed, convenient construction and low cost.
Features
·Resistant to acid, alkali, low temperature and aging
·Good heat-resistance performance, without creep deformation at the usual temperature
·Resistant to water damage, steady load in longterm and moist environment
·Anti-welding, good performance of inflaming retarding
·Good quake-proof performance
Parameters
Rebar Grade |
Rebar Diameter
|
Drilling Diameter
|
Anchoring Depth
|
Design Tension
|
Standard Tensile Resistance (KN) |
Ⅰ |
6 |
10 |
≥80 |
5.9 |
6.6 |
Ⅰ |
8 |
12 |
≥120 |
10.5 |
11.8 |
Ⅰ |
10 |
14 |
≥150 |
16.5 |
18.5 |
Ⅰ |
12 |
16 |
≥180 |
23.7 |
26.5 |
Ⅱ |
10 |
14 |
≥140 |
23.5 |
26.5 |
Ⅱ |
12 |
16 |
≥160 |
33.9 |
37.9 |
Ⅱ |
14 |
18 |
≥190 |
46.2 |
51.5 |
Ⅱ |
16 |
20 |
≥220 |
60.3 |
67.3 |
Ⅱ |
18 |
22 |
≥270 |
76.3 |
85.2 |
Ⅱ |
20 |
25 |
≥300 |
94.2 |
105.2 |
Ⅱ |
22 |
28 |
≥330 |
113.9 |
127.3 |
Ⅱ |
25 |
32 |
≥380 |
147.2 |
164.4 |
Ⅱ |
28 |
35 |
≥480 |
184.6 |
206.1 |
Ⅱ |
30 |
38 |
≥590 |
211.9 |
236.7 |
Ⅱ |
32 |
40 |
≥650 |
241.1 |
269.0 |
Curing Time
Base Material Temperature(℃) |
Installation Time(min) |
Initial Setting Time(min) |
Curing Time (h) |
-5-0 |
20 |
30 |
5 |
0-10 |
15 |
20 |
3 |
10-20 |
10 |
16 |
2 |
≥20 |
5 |
12 |
1 |
Planting-bar Quantity per Barrel of High Strength Construction Structural Adhesive(15KG)
M8 |
M10 |
M12 |
M16 |
M20 |
M24 |
M30 |
1600 |
1100 |
500 |
220 |
120 |
60 |
25 |
Remarks: The depth of planting-bar is 12D.(The data mentioned above is just for your reference)
Applications
·Implant rebars and screwed rods for various building structures
·Building structure reinforcement
·Plant steel bars for building framework and shear walls
·Fix various equipment bases
·Reinforcement for such rebuilding and expansion projects as railway, road, bridge, water conservancy.
·Fix billboards, tunnel lines, sound insulation boards and guardrails of elevated roads
Packing
After being packed separately in plastic bags, the adhesive and curing agent are put in a plastic barrel. There are two packing specifications: 15kg/barrel and 5kg/barrel.( We can customize barrels under the client’s requirements)
Transportation and Storage
·As a non-dangerous product, it can be transported as common chemical building material.
·Must not expose to the hot sun and rain. Don’t place upside down.
·The product should be stored in a dry warehouse under normal temperature (5~25℃). Storage period is 6 months.
Cautions
·Thoroughly stir the adhesive and clean the drill hole. Must not move the rod before curing.
·Protective products must be taken, such as, gloves, masks, goggles and safety helmets.
·In case of skin or clothes contact, clean with acetone and flush with plenty of water. If swallowed or splashed into eyes, contact physicians immediately.
Huainan Jinde Industry Co., Ltd. | |
---|---|
Country/Region: | An Hui - China |
Business Nature: | Trading Company |
Phone: | 13966488120 |
Contact: | Miss chen (sale Manager.) |
Last Online: | 10 Feb, 2015 |