Applications: Residential house, school, office building, shopping mall, subway and factory
Four wires input: Connect any two of the four terminals in the tube socket into 90~290V AC circuit and install the LED tube, then it can operate normally.
Installation methods: It is much easier to install, remove and maintain by adopting new pattern plastic connectors. Remove the starter and ballast and replace the fluorescent lamp with LED tube light. 90~290V AC voltages can be connected to the two terminals of the tube directly.
Base Type: Special rotative plug (adjustable connector at both side can be circumvolved from 0 to 180 degrees)/ Conventional fixed plug for options