Model: | RC-UVC-640 |
---|---|
Brand: | Ren Chuang |
Origin: | Made In China |
Category: | Industrial Supplies / Environment Protection Facilities / Other Environment Protection Facilities |
Label: | Pipeline ultraviolet , Water tank , stainless steel |
Price: |
-
|
Min. Order: | 1 pc |
Last Online:17 Nov, 2021 |
Rc-uvc-640-pipeline ultraviolet sterilizer
The working principle of the product introduction is to purify the water by using the killing effect of high-intensity short wave ultraviolet rays with a length of 225nm-275nm on microorganisms. When the water flows through the sterilizer, it is irradiated by ultraviolet light, and the bacteria in the water are killed. 2、 Product features of swimming pool sterilization ultraviolet sterilizer III. application scope of swimming pool sterilization ultraviolet sterilizer
Rc-uvc-640-installation of pipeline ultraviolet sterilizer
. commissioning: 1. The ultraviolet sterilizer shall be installed horizontally (vertical installation is strictly prohibited). 2. The ultraviolet sterilizer cylinder shall not bear external pressure. 3. The ultraviolet sterilizer shall be installed at the outlet of the water tank or tower. If the water volume is large, the water pressure is high or the pipe network is too long, it is better to install it on the water transmission main (Branch) pipe close to the user. 4. Extending outward from both ends of the ultraviolet sterilizer, a space of ≥ 1m and ≥ 0.4m shall be reserved respectively to facilitate the replacement of lamp tubes. A barrier free space of 0.6m shall be reserved in front of the control panel of the ultraviolet sterilizer to facilitate maintenance. 5. No matter one or more ultraviolet sterilizers are used in parallel, bypass pipeline and stop valve shall be installed for maintenance
。 6. Reasonably select the installation position and pay attention to the waterproof and moisture-proof of the electric control part. 7. Select the power socket, wire or terminal block for connection according to the voltage and power marked on the nameplate. 8. Quartz glass sleeve and ultraviolet lamp are valuable and fragile products, and collision shall be avoided in transportation, installation and use. Management system for after-sales maintenance work 1. After the equipment is commissioned and delivered to the customer for use, it shall be established within five working days: (1) customer maintenance record form; (2) . operating procedures for equipment group; (3) Assist customers to establish water treatment system operation management system and relevant daily maintenance requirements; 2. Regularly visit or consult customers every two months to understand the operating conditions of the equipment and deal with problems in time; Conduct on-site inspection on equipment operation status once a quarter and make inspection records; 3. After receiving the customer's maintenance information, first fill in the customer warranty form, and fill in the record for the record after solving the fault that can be solved in the, which can be used as a reference for the future fault type of the equipment; 4. For the failure that cannot be solved, it shall be arranged according to the manpower of technical service personnel and the degree of maintenance urgency, but it shall not exceed the specified time; 5. When arriving at the customer's maintenance site, first detect the fault phenomenon of the customer's unit, check whether the parts are damaged, and make records of damaged parts; 6. Faults not caused by parts damage shall be solved on the spot. If parts need to be replaced, they shall be solved within 2 working days after receiving new parts; 7. After the maintenance of each unit, the maintenance record form shall be filled in immediately, and filed after the person in charge of the user signs the opinions. At the same time, the maintenance record form shall be sent to the customer service center of the manufacturer's headquarters for filing; 8. Each time the customer's unit is repaired, the replaced spare parts shall fill in the replacement list of maintenance spare parts, which shall be signed by the customer and the person in charge of the office and then transmitted to the customer service center of the manufacturer for filing; 9. After each repair, the technical service personnel responsible for the repair must carefully fill in the customer quality information feedback form and send it to the customer service center of the headquarters for filing; 10. The originals of all forms shall be summarized at the end of each month and sent back to the customer service center of the headquarters for archiving; 11. Collect all the replaced defective parts to the customer service center of the company, and send them back to the headquarters within the specified time limit to offset the received maintenance parts.
V
Contents of maintenance ① contents of maintenance ① maintenance of water treatment (circulating water bypass integrated water processor): 1) check the working state of each unit; 2) Check the working status of electric butterfly valve and safety valve, 3) check whether the connectors and connecting wires of electrical control components are fastened, and replace damaged wires and electrical components; 4) Check whether the operation status of electrical components is normal and whether the relevant control function is reliable; ② 1) if the repair occurs within the warranty period of our company and the equipment damage is caused by the quality problem of our products, all expenses will be borne by our company. 2) If the maintenance occurs during the warranty period of our company, and the maintenance reason is not caused by the product quality of our company, our company will charge the corresponding cost fee. 3) If the time of maintenance has exceeded the warranty period of our company, the cost shall be settled through negotiation. ③ . emergency maintenance schedule: our company will respond within 2 hours after receiving the notice of emergency maintenance.
Payment Terms: | TT |
---|---|