Product Advantages |
·Suitable for all kinds of wall |
·High pull-off strength for a higher security of the system |
·Low thermal conduction addition value to avoid thermal bridge |
·Galvanized layer on the steel nail to protect the nail from alkali |
|
Remarks |
1)Start drilling after sufficient hardening of the glue (min 24h later) |
2)Clean the drilled hole |
3)Make sure that not any damage to the thermal insulation layer or substrate were made during fixing the anchor |
4)Make sure that the depth of drilling is deeper than 40mm and the anchoring depth is min. 30mm |
5)The top of anchor can not be protrudent out of the surface of the thermal insulation layer |
6)For the tile system the anchor must be fixed through the thermal insulation layer, the alkali-resistant glass-fibre-mesh and fresh base coat; for the plaster system the anchor can fixed directly through the thermal insulation layer |
|
Application environment |
Temperature:5°C~35°C |
Avoid raining, high temperature and frost |
Avoid direct sunlight and class 5 wind |
|
SA EPS system is a lightweight, low density system employing expanded polystyrene insulation with adhesive and mechanical dowel fixings |
Dowel is a part of SA - external wall Insulation systems of external building walls,The finishing coat can be tile |
|
|