Model: | 齐全 |
---|---|
Brand: | guanfei Guardrail plate |
Origin: | Made In China |
Category: | Transportation / Transportation Facilities / Roadway Safety |
Label: | Highway guardrail pl , Guardrail plate |
Price: |
¥115
/ slice
|
Min. Order: | 50 slice |
Should coronary fly, high-speed guardrail plate complete high-speed guardrail plate crown highway guardrail plate complete specifications
(1) double barrier plate: 4320 mm in length, width of 310 mm, 85 mm deep, thickness of 3 mm / 4 mm.
Three guardrail plate: a length of 4320 mm, width 506 mm, 85 mm deep, thickness of 4 mm.
(2) round columns: 140/114 mm in diameter, column wall thickness of 4/4.5 mm.
Fang Lizhu: length 130 mm, pillar thickness 6 mm.
Column length is 1200 mm / 1500 mm / 1800 mm / 2150 mm, etc.
(3) column cap: two-thirds of mm thickness, hole is apart from the 100/150 mm, 114/140 mm in diameter.
(4) prevention blocks: 196 * 178 * 200 mm, thickness points 3/4/4. 25/4.5 mm.
Bracket: length 300 mm, 70 mm wide, 4 mm / 4.5 mm thickness.
(5) the bolt: M16 * 50 * 170 / M16 * 150 / M16 / M16 42 / M16 * * 35
Highway guardrail plate code instructions
Structure form code
Gr - wave beam guardrail
GRBS - prevention of wave beam guardrail
Grd - combination waveform guardrail
Gc - cable guardrail
Gw - concrete guardrail
Gwb - basic concrete guardrail
Gwm - modified concrete guardrail
Collision avoidance level code
A - side outline A level
S - roadside s-class
Am - median grade A
Sm - median s-class
Embedding condition code
E - buried in soil
Em -- the central zone of concrete guardrail, interlock in grassroots E1, roadside concrete guardrail, embedded in the base
E2, roadside concrete guardrail, connected to the lower structure
B - embedded in the concrete foundation
R - concrete guardrail by force reinforced with the base connection
Highway guardrail plate installation considerations
Crown pillar fly installation engineering implementation:
1, pillar installation must be on the dirt road shoulder reinforcement can only be carried out under the premise of the construction, and set in the culvert structure, channel, and long-span Bridges, in the process of main project installation guardrail plate, the pillar of the installation should first deal with flange and anchor bolt.
2, construction preparation and construction organization in detail. Installation tools are: the pile driver, excavation, ramming tools, pliers, hammer, theodolite, level, tape measurement tools, etc.
3, waveform guardrail construction, should accurately grasp the various facilities, especially the embedding various piping in embankment precise location, in the process of construction, are not allowed to cause any damage to the underground facilities.
Column layout:
1, according to the drawings to lofting of pillar, and to interchange, Bridges, channels, culverts, and as the locus of control, such as range positioning. As for the lowest range when the unit.
2, pillar lofting available adjustment period of adjusting the spacing, and use the methods of distributing the spacing fraction number processing.
After 3, pillar lofting, should investigate the ground state of each pillar position. In case of underground communication pipe, drain pipe, etc., or insufficient buried culvert item of soil depth, should adjust the position or some column concrete foundation fixed way
Post installation:
1, post installation should be consistent with the design, and coordinated with road alignment.
2, column should be deeply buried in the grave, reach the design depth, vertical and pavement.
3, general road, column can be used in construction, the construction should be accurate positioning, when into the deep, pillar parts must not be pulled out to correct, must pull out all its, after waiting for foundation compaction in scored again.
4, and cannot be used in construction, can be used drilling construction technology, bridge structures are filling height can not meet the requirement of the columns, into the depth of concrete foundation fixed method is taken.
After 5, pillar in place, the horizontal and vertical direction should form a smooth line.
6, guardrail and the end of the column, the gradual coordinates for installation shall be stipulated in the design.
7, 7 because of two phases is used for the road construction, the tailgate design drawings in accordance with the column hole when installation, installation in one, the second phase of construction order respectively and raise the waveform guardrail plate height.
Waveform guardrail installation:
1, waveform guardrail board through mutual splice bolts joining together, and the connecting bolt is fixed on the column and beam.
2, waveform guardrail board connection bolt and splicing bolts should not be early to tighten, so that during the installation process and structure were adjusted timely by means of using the wave beam slotted hole, make them form a smooth line, avoid local bump.
3, waveform guardrail plate top surface should be coordinated with road vertical curve. When the line shape of the waveform guardrail think satisfied, before the last screw down the bolt.
guabfei Anpingxian wire mesh products co., LTD | |
---|---|
Country/Region: | He Bei - China |
Business Nature: | Manufacturer |
Phone: | 13784178688 |
Contact: | guanfei (Sales department) |
Last Online: | 09 Jul, 2016 |