Model: | AC-5/10/13 |
---|---|
Brand: | RPT |
Origin: | Made In China |
Category: | Construction & Decoration / Other Construction Materials |
Label: | colored cold mix , color cold asphalt , Colored cold pavemen |
Price: |
US $600
/ Ton
|
Min. Order: | 1 Ton |
Quick Details
Place of Origin: Anhui, China (Mainland) Brand Name: Roadphalt Model Number: Roadphalt colored modified Asphalt color: red , green , yellow and brown package: 25kg/ bag and 1 ton /bag .
Packaging & Delivery
Packaging Details: 25kg /bag and 1 ton/ bag
Delivery Detail: within 7 days
Specifications
sell colored cold modified Asphalt mixture
1.It is easy to use and take when you need.
2.Pavement traffic will be resumed
sell colored cold modified Asphalt mixture
1. It is easy to use and take when you need.
2. Pavement traffic will be resumed immediatel
3. Packaging bag can be stored permanently closed.
1. Performance of Roadphalt colored cold modified asphalt mixture
Roadphalt colored cold modified asphalt mixture has some basic performances such as looseness, compaction,
water stability, storage, basic strength and construction at room temperature, and they are described as follows:
A. Colored cold modified asphalt can cover wet or even completely wet aggregate.
B. Roadphalt colored cold modified asphalt mixture has better construction performances at low temperature.
C. Roadphalt colored cold modified asphalt mixture can combine the original pavement closely when there is
some water in the pothole.
D. In the dry and dusty hole, Roadphalt colored cold modified asphalt mixture can adhere to original pavement.
E. At high temperature, it has sufficient resistance to tire load.
F. Only a limited initial compaction is needed, and it has resistance to long-time compaction and track.
G. It has excellent resistance to water damage performance.
Product profile
Roadphalt colored cold mix asphalt concrete surface layer of the system is a efficient construction plan. Which makes the roadphalt colored cold modified asphalt mixture fast molding by using paving equipment. The system uses unique OGFC-5 open-graded skeleton void structure, the voidage of pavement can reach more than 12%. The thickness of the molding is 0.7-1.5cm .
It is used to build road colored asphalt surface or pave Colored asphalt layer on the original pavement.As a new green pavement material, the advantages of system are economic, environmental, beautiful and convenient .
Scope
Landscape garden
Square
Non-motorized vehicle、 Sidewalk
Bridge floor 、 Elevated pavement
Other pavements
Product Features
Generally, the thickness of conventional colored hot mix asphalt concrete surface layer not less than 3cm .However , the construction thickness of roadphalt colored
cold mix asphalt concrete surface layer of the system just need 0.7-1.5cm. Material consumption is reduced by 50%
2. Reduce production and construction cost
Before mixing , need to ensure aggregate dry and clean .
3. colourful
Cold mix technology without going through the high-temperature test, the
pigment the molecular composition of has not changed, so it can maintain colorful and durable.
4.Environment-friendly
Production at room temperature, so there is no asphalt smoke and dust emission.
The whole construction process, without any pollution.
5.Convenient construction at room temperature
In the above 10 ℃ can be construction. Not existing the loss of cooling the mixture to cool or cold threshing and other issues during construction .
Excellent performance & stable quality
The system can ensure the cohesive materials have excellent cohesive properties because of using special open-graded void skeleton structure. In addition, it can’t appear bleeding phenomenon under the vehicle load and high temperature condition
The system uses unique open-graded void skeleton structure , so that can have higher permeability coefficient. Due to the existence of gaps , the rainwater can be ruled out quickly .
The bigger voidage ,the better pavement friction .Due to the system has better slip resistance ,so that can ensure the safety of the driving .
4. Low noise and can improve the comfort of driving
Roadphalt colored cold mix asphalt concrete surface layer of the system use unique OGFC-5 open-graded skeleton void structure, it can reduce the atmospheric pressure. The conventional dense graded pavement’s noise can be reduced 3-4 DB and the cement pavement’s noise can be reduced 4-6 DB.
Construction guide
Construction process :
Original pavement → pre-treatment → feeding → paving → roller compaction → Molding → open the traffic
Steps:
·Pavement pre-treatment
The original pavement should be dried and cleaned. Besides, the flatness and camber of the road should meet the requirement of construction.
·Feeding
It’s better to transport by using dump trucks, especially construction in large-scale. The site should have appropriate lifting equipment.
·Paving
We recommend using paver and paving thickness is 0.7-1.5cm. If construction in a small area ,you can use artificial paving. In order to avoid segregation, you should control the thickness and flatness of the pavement.
·Roller compaction
We should finish roller compaction within 0.5-1 hours after paving .using double drum roller to static pressure 3-4 times
·Open the traffic
The road can be opened after paving is completed 24 hours later . If you need to open the traffic faster , just make sure the asphalt(the surface of the road ) is dry completely .
Packaging Detail :
25 kg / bag
1,000 kg/ bag
Price Terms: | FOB Shanghai |
---|---|
Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Packing: | 25kgs/bag |
Embed HTML Code: | 2517300000 |
Shanghai Roadphatl Asphalt Tecnology Co.,Ltd | |
---|---|
Country/Region: | Shang Hai - China |
Business Nature: | Manufacturer |
Phone: | 13917123147 |
Contact: | Gina Zou (Sales Manager) |
Last Online: | 31 Mar, 2015 |